4
Use
4.1
Turn on the water heater
Start the water heater as follows:
Fill the water heater (see section 7.8.1).
Open the manual gas valve (see section 7.3).
Switch on the power to the water heater using the isolator between the water heater
and the power supply.
Switch the controller ON by setting the control switch to position I.
The display will now show INTERNAL CHECK for about 10 seconds and will then go to
the main menu.
Press once on the blue arrow [ ] to position the cursor beside ON, then press
[ENTER]. The display shown in the figure will appear.
Confirm the selection START OPERATION with [ENTER] .
The appliance is now in ON mode. If there is a heat demand, the appliance will run
through the heating cycle (see section 4.1.1).
If the heating cycle is not run, there is no heat demand; if this is the case, T
probably need to be set (see section 4.3.3).
4.1.1
The appliance's heating cycle
The entire cycle is explained in the following example, which assumes the water heater is
in operating mode ON.
Note
The same operating cycle applies to the other operating modes.
When the water heater starts, it will run through the following steps:
The water temperature drops below the set temperature of (for example) 65°C. The
controller detects a heat demand and starts the operating cycle.
The icon is activated.
The message HEAT DEMAND appears.
1.
2.
3.
4.
5.
6.
n
1.
-
-
0311704_BFC_28-120_III_
ENEN_V2.4, 2022-10-17
25
Содержание BFC Cyclone 120
Страница 6: ...6 ...
Страница 13: ...User part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 13 ...
Страница 14: ...14 ...
Страница 16: ...16 User part ...
Страница 18: ...18 User part ...
Страница 24: ...24 User part ...
Страница 41: ...Installation Maintenance and Service part 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 41 ...
Страница 42: ...42 User part ...
Страница 46: ...46 Installation Maintenance and Service part ...
Страница 52: ...52 Installation Maintenance and Service part ...
Страница 59: ...Fig Venting systems 0311704_BFC_28 120_III_ENEN_V2 4 2022 10 17 59 ...
Страница 76: ...76 Installation Maintenance and Service part ...
Страница 78: ...78 Installation Maintenance and Service part ...
Страница 84: ...84 Installation Maintenance and Service part ...
Страница 102: ...Fig Dimensions BFC 28 30 50 60 102 Installation Maintenance and Service part ...
Страница 104: ...Fig Dimensions BFC 80 100 120 104 Installation Maintenance and Service part ...
Страница 112: ...12 7 Declaration of conformity 112 Installation Maintenance and Service part ...
Страница 113: ......
Страница 114: ......
Страница 118: ...116 Installation Maintenance and Service part ...