background image

41

        

Installation & Operation Manual

6  

Start-up 

Filling hot water heater

1.  Close the system’s drain valve by turning the handle 

clockwise.

2.  Open a nearby hot water faucet to permit the air to 

escape.

3.  Fully open the cold water inlet pipe valve allowing the 

water heater and piping to be filled.

4.  Close the hot water faucet as water starts to flow.
5.  The water heater is ready to be operated.

Check for gas leaks

Before starting the unit, and during initial 
operation, smell near the floor and around 
the unit for gas odorant or any unusual odor.  
Remove the front access panel and smell 
the interior of the water heater enclosure.  
Do not proceed with startup if there is any 
indication of a gas leak.  Use an approved 
leak detection solution. Repair any leaks at 
once.

 WARNING

Propane water heaters only – Your propane 
supplier mixes an odorant with the propane 
to make its presence detectable.  In some 
instances, the odorant can fade, and the gas 
may no longer have an odor.  Before startup 
(and periodically thereafter), have the 
propane supplier verify the correct odorant 
level in the gas.

 WARNING

Check vent and air piping

Inspect vent piping and air piping for signs of deterioration 
from corrosion, physical damage or sagging.  Verify air piping 
and vent piping are intact and correctly installed per this 
manual.

Placing the unit in operation

Water heater operational checks

1.  Turn the water heater main power switch to the “ON” 
 position.
2.  Verify operation of the electronic controller.
3.  Program the electronic controller to desired settings.
4.  Push the reset for the low water cutoff (if equipped).
5.  Ensure that maximum flow to the unit does not exceed   
 

55 GPM on Models 400 - 750 and 90 GPM on Models 

 

1000 - 2100.  Verify by checking temperature rise while 

 

burner is firing at 100% of rated input.

6.  Install a manometer on the gas supply to the water heater and 
 

verify minimum gas supply pressure as the burner fires at 

 

100% of rated input.

7.  Verify operation of safeties as necessary (low water 
 

cutoff, high limit, gas pressure, etc.,).

8.  Verify that all adjustable points in the electronic controller 
 

are set as required.

9.  Once the unit analysis is complete, test the safety shutoff 
 

device by turning the manual shutoff valve to the OFF 

 

position and ensuring that the unit shuts down and 

 

registers an alarm.  Open the manual shutoff valve and reset 

 the 

control.

10.  Place the water heater back into normal operation.

Water heater operation

11.  Water heater should begin the start-up process for the 
 

sequence of operation.

12. The unit will ignite at the proper ignition speed and 
 

will stage to meet the system demand.

13.  Ensure that inlet water temperature does not fall below 
 

the specified minimum for the unit.

14. Based on tank demand, water heaters may run for an 
 

extended period of time at a reduced rate of input to 

 maximize 

efficiency.

15. As tank demand is satisfied, the burner will cycle off 
 

and the combustion air blower will run for a post 

 

purge operation before the unit shuts down.

Check thermostat circuit(s)

1.  Disconnect the two external wires connected to the enable 

terminals on the connection board.

2.  Connect a voltmeter across these two incoming wires.  

Close each thermostat and relay in the external circuit 
one at a time and check the voltmeter reading across the 
incoming wires.

3.  There should NEVER be a voltage reading.
4.  If a voltage does occur under any condition, check and 

correct the external wiring.  

5.  Once the external thermostat circuit wiring is checked and 

corrected if necessary, reconnect the external thermostat 
circuit wires to the connection board.  Allow the unit to 
cycle.

Содержание 400 - 2100

Страница 1: ...Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electr...

Страница 2: ...ting 17 19 Vertical Vent Ducted Air 20 22 Sidewall Power Venting 23 25 Sidewall Power Venting Ducted Air 26 Direct Vent Sealed Combustion 27 30 Outdoor Installation 31 3 GAS CONNECTIONS Connecting to...

Страница 3: ...rvice agency or the gas supplier Special instructions REMOVAL OF COMBUSTION CHAMBER LINING OR BASE PANELS Avoid breathing dust and contact with skin and eyes Use NIOSH certified dust respirator N95 Th...

Страница 4: ...See Section 7 Operating Information Freeze Protection for more information Safety information 1 This unit is only for use with the type of gas indicated on the rating plate 2 If you smell gas shut off...

Страница 5: ...NPT Please reference the National Fuel Gas Code charts for connection details 14 Hot surface ignition module The hot surface ignition module controls the blower s hot surface igniter and gas valves A...

Страница 6: ...How it works IMG00570 13 26 18 18 Models 400 750 Front View Models 400 750 Left Side inside unit Models 400 750 Right Side inside unit Models 400 750 Rear View IMG00571 15 IMG00572 14 8 17 9 21 24 19...

Страница 7: ...rks continued Models 1000 2100 Left Side inside unit Models 1000 2100 Right Side inside unit Models 1000 2100 Rear View Models 1000 2100 Front View IMG00574 13 26 18 18 IMG00575 15 25 IMG00576 24 4 8...

Страница 8: ...eet above sea level up to 4 500 feet Consult the factory for installations above 4 500 feet elevation Genesis AHRI Rating Model Number Note N Natural P Propane Input MBH Note 3 Min Max Gross Output MB...

Страница 9: ...appliance directly on carpeting or other combustible material 9 Maintain required clearances from combustible surfaces reference the Indoor Clearances from Combustible Construction Section this page 1...

Страница 10: ...be installed to prevent snow and ice ac cumulation around the unit or its venting system Outdoor installation Combustion air options CAUTION Under no circumstances should the equipment room ever be u...

Страница 11: ...ee FIG 1 5 Each of the two openings must have a net free area of one square inch per 1000 Btu input 22cm2 per kW but not less than 100 square inches 645cm2 Figure 1 4_Outside Combustion Air Two Openin...

Страница 12: ...OMBUSTION AIR SUPPLY TO EQUIPMENT ROOM Model Number Outside Air from 2 Openings Directly from Outdoors Outside Air from 1 Opening Directly from Outdoors in2 Inside Air from 2 Ducts Delivered from Outd...

Страница 13: ...stion air inlet from either the back or right side of the unit To arrange the combustion air inlet for side entry follow the steps below 1 Remove the metal panel from the unit s side wall see FIG 1 7...

Страница 14: ...oduction in the vent CAT IV Positive pressure condensing An appliance that operates with a positive vent static pressure with a vent gas temperature that may cause excessive condensate production in t...

Страница 15: ...ination with air supplied from the equipment room see page 23 This option uses the installation of a special air inlet vent cap on top of the unit see page 31 IMG00580 IMG00583 NOTE CAT I B VENT MATER...

Страница 16: ...system to prevent sagging Provide an upward slope of at least 1 4 inch per foot 21mm m on all horizontal runs from the unit to the vertical flue run or to the vent terminal on sidewall venting install...

Страница 17: ...e venting tables for double wall vent to properly size all vent connectors and stacks Follow the vent manufacturer s instructions when installing Type B vents and accessories such as firestop spacers...

Страница 18: ...ill result in condensing of flue products damage to the masonry flue tile insufficient draft and possible spillage of flue products into an occupied living space Carefully inspect all chimney systems...

Страница 19: ...vents are installed with vent terminations recommended by the vent manufacturer Figure 2 2_Vent Termination from Peaked Roof 10 ft or More From Ridge Figure 2 4_Vent Termination from Flat Roof 10 ft...

Страница 20: ...unit only See Table 2B page 22 for kit numbers Locate the unit as close as possible to the sidewall where you will install the combustion air supply system WARNING Locate and install the combustion ai...

Страница 21: ...e air inlet termination elbow at least 12 30cm above the roof or above normal snow levels If the air inlet cap is within a 10 foot 3 05m radius of the flue outlet the point of termination for the comb...

Страница 22: ...oducts can cause personal injury or death due to carbon monoxide poisoning For single unit installations with sidewall air inlet you must order the sidewall air inlet kit from the appliance manufactur...

Страница 23: ...connectors thimbles caps etc When planning the venting system avoid possible contact with plumbing or electrical wiring inside walls The maximum installed length of sidewall vent pipe with an induced...

Страница 24: ...or window or gravity air inlet into any building Locate vent termination at least 8 feet 2 4m horizontally from any combustion air intake located above the sidewall termination cap This vent system ha...

Страница 25: ...le to chimney or gas vent When a vent system is disconnected for any reason the flue must be reassembled and resealed according to the vent manufacturer s instructions The installed length of flue fro...

Страница 26: ...nt Kit for sidewall installation from the appliance manufacturer See Table 2D for kit numbers Each kit includes a sidewall powered vent cap fan proving switch controls combustion air inlet cap to supp...

Страница 27: ...drain tubing Prime the trap loop by pouring a small quantity of water into the drain hose before assembly to the vent Secure the trap loop in position with nylon wire ties Use caution not to collapse...

Страница 28: ...e an air space clearance of 2 inches 5 1cm around the flue pipe The diameter of the opening for installation of the sidewall cap will be 4 inches 10 2cm larger minimum than the nominal diameter of the...

Страница 29: ...ter VERTICAL DV BOX ADAPTER HORIZONTAL DV BOX ADAPTER Air inlet piping materials The air inlet pipe s must be sealed Select air inlet pipe material from the following specified materials PVC CPVC or A...

Страница 30: ...the first elbow The outlet of the second 90 elbow will be pointing down You may use a 90 elbow and a 90 straight elbow to make this assembly If you use a straight piece of pipe between the two 90 elbo...

Страница 31: ...operational problems bad combustion or damage to controls Locate unit at least 3 feet 0 91m from any wall or vertical surface to prevent wind conditions from affecting performance Multiple unit outdo...

Страница 32: ...u must adjust regulator pressure follow the instructions under Gas Manifold Pressure Adjustment in the Genesis Service Manual Do not increase regulator pressure beyond specified pressure setting Gas c...

Страница 33: ...2 2 1 2 2 1 2 750 1 1 2 2 2 2 1 2 3 1000 2 2 2 1 2 2 1 2 3 1250 2 2 1 2 2 1 2 3 3 1450 2 1 2 2 1 2 3 3 3 1 2 1800 2 1 2 3 3 3 1 2 3 1 2 2100 2 1 2 3 3 3 1 2 4 For each elbow or tee add equivalent stra...

Страница 34: ...supply pressures 9 If gas pressure is out of range contact gas utility gas supplier qualified installer or service agency to determine necessary steps to provide proper gas pressure to the control 10...

Страница 35: ...code requirements for a low water cutoff device on water heaters requiring forced circulation for operation Low water cutoff if equipped If this unit is installed above radiation level a low water cu...

Страница 36: ...quiet efficient operation Pump selection is critical to achieve proper operation A pump should be selected to achieve proper system design water temperature rise Two heat exchanger head loss charts FI...

Страница 37: ...ure spikes and mechanical component failures To prevent short cycling of the water heater it is important to limit the cycles to six or fewer per hour TABLE 4B WATERHEATERTEMPERATURERISEATMAXIMUMFLOW...

Страница 38: ...only Type T wire 63 F 35 C rise on all wiring between the unit and field installed devices 2 Encloselinevoltagewireexteriortotheunitinapproved conduit or approved metal clad cable 3 The pump must run...

Страница 39: ...onic control should be set to Sequencer Mode 3 to act as an additional high limit control This will prevent problems between the setpoints of the EMS and the water heater s internal controller Termina...

Страница 40: ...pump delay Remote mounting of a sensor To mount remote sensor follow the guidelines below Take care to correctly wire sensors to the unit Erratic temperature readings can be caused by poor wiring prac...

Страница 41: ...odels 1000 2100 Verify by checking temperature rise while burner is firing at 100 of rated input 6 Installamanometeronthegassupplytothewaterheaterand verify minimum gas supply pressure as the burner f...

Страница 42: ...eshooting Section of the Genesis Service Manual The venting system must be installed so that it will prevent flue gas spillage and carbon monoxide emissions which will result in severe personal injury...

Страница 43: ...e safety information above on this label 2 Turn off all electric power to the appliance 3 Open control access panel 4 This appliance is equipped with an ignition device which automatically lights the...

Страница 44: ...system needs by adjusting control parameters These parameters set operating temperatures and appliance operating modes Water heater operation can be based on a tank sensor or an external sequencer dev...

Страница 45: ...Adjust Menu and the ADJUST segment is turned on in the display The display will automatically revert back to the View Menu after 20 seconds of keypad inactivity Once in a menu there will be a group of...

Страница 46: ...of operation Mode 2 for standalone operation and Mode 3 for external sequenced operation The mode of operation is selected using the MODE item in the Adjust menu Mode 2 Standalone Operation This is t...

Страница 47: ...ult is 2 F DIFF 2 Stage 2 differential Selection is from 2 to 42 F Factory default is 2 F STG DLY Advanced dipswitch position Delay between stages Selection is from 0 00 to 5 00 minutes in 10 second i...

Страница 48: ...UST Dem 023 BOIL ADJUST Dem ON TANK T Mode 2 Boil Max Target 1 Setpoint Target 1 Diff Target 2 Setpoint Target 2 Diff Min DeltaT Pump Off 4 DIFF F 2 135 F TARGET 2 2 DIFF F I 135 F TARGET I 200 BOIL M...

Страница 49: ...ISE SETTING EXCEEDED OPn BOIL OUT SHr BOIL OUT VIEW F I 2 Dem SHr VIEW F TANK I 2 Dem OPn TANK SHr BOIL IN VIEW F I 2 Dem OPn BOIL IN Err MAX T E01 EEPROM POSSIBLY CORRUPT E02 FREEZE PROTECTION Figure...

Страница 50: ...panel after correcting ignition problem Initial heater start up without properly bleeding air from the gas line may require multiple reset functions to achieve proper ignition Four Flashes Igniter fai...

Страница 51: ...he ignition module will go into a soft lockout if conditions of low air low voltage or low hot surface igniter current are present A soft lockout condition will operate the combustion air fans for the...

Страница 52: ...heat exchanger must be manually set before normal operation begins If higher flow rates are required through the water heater an optional Cupro Nickel heat exchanger is available Consult the factory...

Страница 53: ...ssolved solids water may require a larger circulating pump an optional Cupro Nickel heat exchanger and a revised temperature rise specification based on the water chemistry of the water to be heated W...

Страница 54: ...PREFERRED PIPING LAYOUT 2 THE TEMPERATURE AND PRESSURE RELIEF VALVE SETTING SHALL NOT EXCEED PRESSURE RATING OF ANY COMPONENT IN THE SYSTEM 3 SERVICE VALVES ARE SHOWN FOR SERVICING WATER HEATER HOWEV...

Страница 55: ...ED PIPING LAYOUT 2 THE TEMPERATURE AND PRESSURE RELIEF VALVE SETTING SHALL NOT EXCEED PRESSURE RATING OF ANY COMPONENT IN THE SYSTEM 3 SERVICE VALVES ARE SHOWN FOR SERVICING WATER HEATER HOWEVER LOCAL...

Страница 56: ...PIPING LAYOUT 2 THE TEMPERATURE AND PRESSURE RELIEF VALVE SETTING SHALL NOT EXCEED PRESSURE RATING OF ANY COMPONENT IN THE SYSTEM 3 SERVICE VALVES ARE SHOWN FOR SERVICING WATER HEATER HOWEVER LOCAL CO...

Страница 57: ...OUT 2 THE TEMPERATURE AND PRESSURE RELIEF VALVE SETTING SHALL NOT EXCEED PRESSURE RATING OF ANY COMPONENT IN THE SYSTEM 3 SERVICE VALVES ARE SHOWN FOR SERVICING WATER HEATER HOWEVER LOCAL CODES SHALL...

Страница 58: ...er flow Proper pipe size between the heater and storage tank MUST be maintained to ensure that the standard pump supplied on the water heater will maintain desired flow TABLE 8C COMMON WATER MANIFOLD...

Страница 59: ...e from the Operator Interface for water heater operation is 190 F 88 C The control is factory pre set at approximately 120 F 49 C Facilities with small children or invalids may require 120 F 49 C or a...

Страница 60: ...panel as shown in FIG 8 6 The setting of this control knob limits maximum discharge water temperature The water heater temperature limit control is adjustable up to a maximum setting of 210 F 99 C Thi...

Страница 61: ...and Operation Manual If combustion or performance indicate need Clean heat exchanger with a stiff bristle brush Remove and clean burners using water Dry before re assembling Clean the blower wheel wit...

Страница 62: ...in sections reducing heat transfer overheating heat exchanger and causing heat exchanger failure Leaking water may also cause severe property damage 1 Inspect all water and gas piping and verify to b...

Страница 63: ...operly replace the relief valve Ensure that the reason for relief valve weeping is the valve and not over pressurization of the system due to expansion tank waterlogging or undersizing WARNING WARNING...

Страница 64: ...operly installed and adjusted units seldom need flue cleaning All gaskets sealants on disassembled componentsorjacketpanelsmustbereplaced with new gaskets sealants on reassembly Gasket and sealant kit...

Страница 65: ...rs if removed from the unit Note Make sure frame runners seal securely where they contact the front and rear compartment refractory 10 Carefully reinstall inner jacket panels burners manifolds wires a...

Страница 66: ...3 4 2 3 4 1 W BK W W Y C NO C NO NC BK R 9 8 7 6 4 3 2 1 10 5 O BK BR W BR W O BK 1 2 PR 2 1 O BK W R BK O PR GY GY BR BL Y 24VCOM 24VAC 120VAC 120VAC 2 12 24VCOM 24VAC BL 120VNEU 120VAC 24VAC 24VCOM...

Страница 67: ...BK BL BL BK BL Y W 24V COMMON GROUND 120VAC 120VNEU 24VCOM 24VAC LWCO CONNECTOR LWCO CONNECTION T T SINGLE SPEED BLOWER BK W 0500 0750 2100 R BK Y R BL O O OPTIONAL R O G O BK O 4 3 2 1 BL Y 24VCOM 24...

Страница 68: ...CAL SHOCK ENSURE ALL BRANCH CIRCUITS ARE DE ENERGIZED BEFORE ATTEMPTING TO SERVICE THIS EQUIPMENT WHERE POSSIBLE SW UTILITIES GAS W CONNECTED TO THE U MAY VARY FROM T DEPENDING UPON CONNECTED OR FAULT...

Страница 69: ...M FOR ADDITIONAL NOTES W BL 1 4 3 2 R Y Y Y FACTORY FLOW SWITCH AUX HI LIMIT NO NC C O O BK O C NO O PR BK FF 1 T T W R BK 1 2 1 2 1 2 1 2 HIGH LOW FIRE RELAY W W LOUVER CONTACTS LOUVER PROVING LV LM...

Страница 70: ...Installation Operation Manual 70 Notes...

Страница 71: ...or and returning the claimed defective part to such distributor c All cost necessary or incidental for any material and or permits required for installation of the replacement 4 LIMITATIONS ON IMPLIED...

Страница 72: ...Revision Notes Revision A ECO C1XXXX initial release GNS I S Rev A 03 13...

Отзывы: