background image

18

Any safety devices including low water cutoffs used in conjunction
with this boiler should receive periodic (every six months) inspection
to assure proper operation.  A low water cutoff device of the float
type should be flushed every six months.  Periodic checks, at least
twice a year, should be made for water leaks.

More frequent inspections may be necessary depending on water
conditions.

The boiler-mounted gas and electrical controls have been
designed to give both dependable service and long life.  However,
malfunction can occur, as with any piece of equipment.  It is
therefore recommended that all components be checked
periodically by a qualified serviceman for proper operation.

RELIEF VALVE

The safety relief valve should be opened at least twice a year to
check its working condition.  This will aid in assuring proper
pressure relief protection.  Lift the lever at the top of the valve
several times until the valve seats properly and operates freely.

COMBUSTION AIR FILTER

If the combustion air supply to the boiler contains dust, dirt, drywall
dust etc. a filter must be installed. An air filter is not supplied with the
boiler as shipped from the factory. The installer must provide a filtering
system in the air inlet  to the boiler if dust, dirt or construction  dirt
can be pulled into the boiler through the inlet air piping. Periodically
clean air filter per the manufacturer's instructions.

BLOWER COMPARTMENT

The blower compartment should be cleaned annually to remove
any dirt and lint that may have accumulated in the compartment

or on the blower and motor.  Buildups of dirt and lint on the blower
and motor can create excessive loads on the motor resulting in
higher that normal operating temperatures and possible shortened
service life.

BURNER MAINTENANCE

Qualified servicers should follow this procedure when the boiler’s
burner needs cleaning.

1. Turn off the electrical power to the boiler and close the main

manual gas shutoff valve(s). Allow the boiler parts to cool before
disassembly.

2. Loosen the flange and separate the gas train from the manifold

assembly.

3. Separate the burner from the blower adapter by first removing

the four (4) bolts and subsequently, the blower gaskets. The
blower should be free to move at this point.

FOR DIRECT VENT UNITS: It is necessary to loosen and slide
the rubber coupling on the blower adaptor in order to move
the blower.

4. Loosen the seven bolts on the blower adapter at the base and

move the burner ground wire (Green) aside.

5. Lift the blower adapter and remove the manifold assembly up

from the 6 studs located on the cover plate and remove the
burner gasket.

6. Remove any loose foreign material such as dust or lint with a

vacuum. Check all ports for blockage.  Dislodge any foreign
material causing blockage. Remove any soot or carbon deposits
with a rag making sure to remove any lint  left on the burner by
vacuuming again.

7. Reverse the steps to reassemble the unit.

8. Restore electrical power and gas supply to the boiler.

• Put the boiler back in operation by following the Lighting

and Operating instructions in this manual.

• Check for gas leaks and proper boiler and vent operation.

CONDENSATE REMOVAL SYSTEM

Due to the highly efficient operation of this unit, condensate is
formed during operation and must be removed by the condensate
drain systems.  Inspect the condensate drains and tubes at least
once a month and insure they will allow the free flow of condensate
at all times.  The system must be inspected more frequently in
cold weather if the drain system is located in an area, such as
along the floor, where freezing temperatures are likely to occur.
The condensate drain system must be protected against freezing.
Contact a qualified service agent to inspect and correct the
condition if freezing of the condensate lines is a problem.  The
unit is equipped with a blocked flue switch which will shut the
unit off if condensate is unable to drain and backs up in the
unit.  A blocked flue error will appear when sufficient condensate
accumulates for this condition.

The transparent drain lines and condensate drain on the bottom
of the vent collector should be visually inspected at one month
intervals for blockage, particularly in the areas of the loops in the
lines which trap a small amount of condensate, and the exit point
of the vent collector drain.  Condensate in portions of the line other
than the loop area indicates a blockage in the drain line.  Flush the

Содержание 1000 SERIES 100

Страница 1: ...ng Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be per...

Страница 2: ...the requirements of the National Fuel Gas Code as it relates to the installation of gas fired boilers The qualified installer must have a thorough understanding of this instruction manual Service Age...

Страница 3: ...3 GENERAL SAFETY...

Страница 4: ...trol assembly provided on the boiler met safe lighting and other performance criteria Detailed installation diagrams are found in this manual These diagrams will serve to provide the installer a refer...

Страница 5: ...tally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS INSPECTION The st...

Страница 6: ...6 CONNECTION DIAGRAM...

Страница 7: ...7...

Страница 8: ...8 SCHEMATIC DIAGRAM VB VW 500 750 1000 SCHEMATIC DIAGRAM...

Страница 9: ...9 LIGHTING OPERATION INSTRUCTIONS FOR MODELS VB VW 500 750 AND 1000...

Страница 10: ...m and contains the system fuses The MCB also contains an external communications system to allow for connection to a PC a modem an EMS system or something similar Through this connection multiple boil...

Страница 11: ...flame rod is missing or shorted the flame will not be detected OUTPUTS FROM MCB RELAY CONTACT OUTPUT Alarm MCB 24VAC optional Provides electrical power to operate an external alarm This can be an aud...

Страница 12: ...tivated screens Within each of the screens helpful information can be displayed by pressing the Help button The LED s visually inform the user about the mode the system is in The touch switches allow...

Страница 13: ...ppropriate time then the sequence moves to the Inter Purge state for 15 seconds and the FCB heat sequence is repeated If flame is still not detected after the third try the process declares a fault ju...

Страница 14: ...ure to change the automatically resettable High Limit Setpoint 1 Press the MENU key 2 Scrollthe withtheDOWNkeynexttoUSERSETTINGSCREEN 3 Press the SELECT key 4 Scroll the with the DOWN key until it is...

Страница 15: ...rds in screens to reach a desired item and to change setpoints and user settings They have an auto increment decrement feature for some of the configurations and values When you first press one of the...

Страница 16: ...ins on the connector at the end of the probe cable The value should be approximately 0 ohms when the temperature of the probe is less than 220 F Low Water Water level is too low Flashing HARD Caused b...

Страница 17: ...reasonably quiet operation during initial ignition operation and extinction Cause no excessive lifting of flame from burner ports If the preceding burner characteristics are not evident check for acc...

Страница 18: ...ower adapter by first removing the four 4 bolts and subsequently the blower gaskets The blower should be free to move at this point FOR DIRECT VENT UNITS It is necessary to loosen and slide the rubber...

Страница 19: ...specified by the manufacturer of the product Inspect the installed device to insure that it does not cause condensate to remain in the boiler or vent for any reason VENTING MAINTENANCE It is recommen...

Страница 20: ...20 NOTES...

Страница 21: ......

Страница 22: ...22 NOTES...

Страница 23: ...e or provincial law are limited to one 1 year duration for the boiler or any of its parts Some states and provinces do not allow limitations on how long an implied warranty lasts so the above limitati...

Страница 24: ...24 500 Tennessee Waltz Parkway Ashland City TN 37015 Phone 800 433 2545 www hotwater com E Mail parts hotwater com...

Отзывы: