Rapid toasteR VCt-250
6
P/N 00837 Rev. L 03/07
McDonald’s
location
When placing the toaster into service, pay attention to
the following guidelines.
• Make sure power to the unit is off and the toaster
is at room temperature.
• Do not block or cover any openings on the unit.
• Do not immerse cord or plug in water.
• Keep cord away from heated surfaces.
• Do not allow cord to hang over edge of table or
counter.
Connect the unit to the power supply. Refer to the
specification plate for the proper voltage.
WaRNiNG
eleCtRiCal shoCK haZaRd. failURe to
folloW the iNstRUCtioNs iN this MaNUal
CoUld ResUlt iN seRioUs iNjURY oR death.
• electrical ground is required on this appliance.
• do not modify the power supply cord plug. if
it does not fit the outlet, have a proper outlet
installed by a qualified electrician.
• do not use an extension cord with this appli-
ance.
• the toaster should be grounded according to
local electrical codes to prevent the possibil-
ity of electrical shock. it requires a grounded
receptacle with separate electrical lines, pro-
tected by fuses or circuit breaker of the proper
rating.
• Check with a qualified electrician if you are in
doubt as to whether the appliance is properly
grounded.
CaUtioN
bread may burn. therefore toasters must not be
used near or below curtains or other combustible
walls and materials. failure to maintain safe oper-
ating distances may cause discoloration or com-
bustion.
CaUtioN
all electrical connections must be in accordance
with local electrical codes and any other appli-
cable codes.
Unpacking
. Remove unit and all packing materials from
shipping carton.
2. Open the accessory box. It should contain
the following:
• Bun Chute (Figure )
• Bun Feeder (Figure )
• Plastic bag containing the
Release Sheets (not shown)
3. Remove all packing materials and protective
coverings from the unit and parts.
Note: if any parts are missing or damaged, con-
tact a.j. antunes technical service iMMediatelY
at 1-877-392-7854 (North america only), or 630-784-
1000.
iNstallatioN
figure 1. installing bun Chute
POWER
TEMP
DOWN
TEMP
UP
TEMP
SCALE
°C
°F
CAUTION
Bun Chute
Bun Chute
Bun Feeder
hook Bun Chute over
rear Conveyor Cover
Rod
assembling the Unit
. Install the Bun Chute (Figure ).
2. Install the Bun Feeder. The Bun Feeder clips fit
over the tip of the Platen and retain the Release
Sheet (Figures & 9).
Note: Check the Release sheet to make sure it
is not caught in the conveyor. additional Release
sheets can be obtained through your authorized
service agency.