
Page 22
We take care of it.
Carry out cable work.
From the 2-part front wall, first connect
the larger plate at the bottom with 2
screws and brackets to the side parts.
Then connect the smaller plate at the top
with 2 screws and
angle brackets to the side panels.
The installation depth of the concrete
plinth down into the ground should be
around 70 cm.
Figure 5-4 Concrete plinth mounting
Содержание Low Voltage Regulation System
Страница 2: ......
Страница 40: ...Page 38 We take care of it Figure 5 24 Photo instruction use of terminal block 2 ...
Страница 51: ...Page 49 Figure 5 37 Installation thread rods in ring saddle Figure 5 38 Top view pole installation ...
Страница 59: ...Page 57 Figure 6 6 Operation switch disconnector 1 2 3 4 5 Figure 6 7 NH switch disconnectors ...
Страница 63: ...Notes ...