Operating and Assembly Instructions – A.B.S. Flexilo for wood pellets 
 
Scope of delivery 
 

Subject to technical change 

Issue 09/2016 

Page 12 of 30 

©A.B.S. Silo- und Förderanlagen GmbH 

 

4   Scope of delivery 

 
The Flexilo SPRING for wood pellets consists of a 
steel frame, which is shipped bundled on a pallet, and 
a silo bag, which is packed in a carton together with 
accessories and hardware required for assembly. 

 

Delivery of the components 

4.1  Scope of delivery (standard) 

Pos.  Illustration 

Description and 
quantity 

 

1 each Silo bag  
 
of the appropriate size 
packed in a plastic 
bag 

    

 

4 each Frame feet 
 
 
 

 

 

 

 
4 each Supporting   
   bars 
 

 

 

 

 

     

 

 

16 each drawing 
     irons - divided - 
 
In the case of 
rectangular silos, the 
tension struts have 
different lengths  
(

8 x short and 8 x long)

 

Содержание Flexilo SPRING

Страница 1: ...tended for skilled mechanics which have based on expert training the respective knowledge and experience As we are interested in continuously improving our technical documentation we would be pleased...

Страница 2: ...1 Distance from walls 9 3 1 2 Distance from ceiling 9 3 2 Condition of the room 10 3 3 Room fixtures 10 3 4 Room deaeration 11 3 5 Size Storage Volume 11 4 Scope of delivery 12 4 1 Scope of delivery...

Страница 3: ...Wood pellets for non industrial use ENplus Handbook for the certification of wood pellets for heating use version 2 0 Sample fire ordinance 2005 VDI guideline 3464 green print 2012 storage of wood pe...

Страница 4: ...n impair operation of your heating system and have an adverse effect on the storage and conveying equipment Only high grade pellets can assure reliable and problem free operation of the pellet fired b...

Страница 5: ...of not yet released additive pellets PowerPlus pelprotec etc Please contact us for information on the current supply level In case of white rust White rust can occur during transport for example Prot...

Страница 6: ...t possible sources of danger to the customer The currently valid fire protection and VDI guidelines must be satisfied prior to start up In order to avoid hazards associated with improper handling of t...

Страница 7: ...lo for wood pellets when it is delivered Nameplate with calculated storage capacity 2 5 Maintenance Regular cleaning of the bearing is required to ensure continuous trouble free and safe heating opera...

Страница 8: ...process The result is that the release of the volatile components is faster especially in fresh pellets and at high ambient temperatures Emissions usually decrease after a few weeks and the odour asso...

Страница 9: ...r to installation The dimensions of the silo frame are stated on the delivery documents The dimensions of the silo frame can be determined by measuring the steel parts Length of the frame Length of th...

Страница 10: ...ondensation must not occur In case of humidity the room must be ventilated properly The silo fabric is air permeable and may cause the wood pellets to absorb humidity at the silo walls Make also sure...

Страница 11: ...en aerating the Flexilo Only on customer request the Flexilo for wood pellets can be supplied with a filling line and an exhaust air line in case of rooms without exhaust air or in specific cases But...

Страница 12: ...pped bundled on a pallet and a silo bag which is packed in a carton together with accessories and hardware required for assembly Delivery of the components 4 1 Scope of delivery standard Pos Illustrat...

Страница 13: ...and strap according to silo 4 6 8 and 2x spring pipe connection screw 8 included 32x 16x 48x Screw sack with connecting material for drawing irons 32 hexagon screws M12 x 30 16 hexagon nuts M12 48 wa...

Страница 14: ...er filling pipe 1 fastener 36 36 2 pipe clamps M10 M12 pre assembled on the fastener 12 2x 2x 4x Screw set for filling set pre assembled on the fastener 2 hex screws M12 x 25 2 spring washers 12 2 4 w...

Страница 15: ...change Issue 09 2016 Page 15 of 30 A B S Silo und F rderanlagen GmbH 18 OPTIONAL Support Structure for fixing the silo lid pipe must be provided by the customer 19 1 x Assembly Instructions 1 x Filli...

Страница 16: ...ssembling the frame and struts Do not start assembling the silo until you have become familiar with the situation at the installation site and the room layout discussed in Section 3 CAUTION RISK OF IN...

Страница 17: ...09 2016 Page 17 of 30 A B S Silo und F rderanlagen GmbH Connecting the frame feet to the plug in elements of the top and base connectors Assembly of the plug in elements Assemble the steel frame until...

Страница 18: ...silo bag the lifting bar must have boreholes for the filling set 3 Align the silo bag 4 Make the necessary arrangements regarding the fastening of the silo lid according to point 5 4 5 Loop the liftin...

Страница 19: ...ts Assembly Subject to technical change Issue 09 2016 Page 19 of 30 A B S Silo und F rderanlagen GmbH Details of the corner bolting Pay attention to the alignment of the silo when connecting the angle...

Страница 20: ...r the baffle that is sewn into the cover fabric opposite the filler neck Take care of the position of the supporting loops prior to attach the ceiling holders to the spread silo The loops must be atta...

Страница 21: ...the filling set as described in chapter Earthing I II III 2 Use the bolts provided to attach the filling line to the top bar 3 Slide the filler neck over the filling line and beaded edge of the filli...

Страница 22: ...silo size because during the filling the sides of the silo bag will be pressed outwards Generally should the discharge units NOT fixed on the ground so that the silo has the possibility to lift up and...

Страница 23: ...that the bores in the spring pipes will be placed in the out cuts of the loops The eye screws which are included in the scope of delivery will be fixed in the bores with the washers and nuts Put the...

Страница 24: ...attached in a clearly visible location on a frame leg or the filling line Check the room layout wall and ceiling clearance condition of the room fixtures in the room room ventilation Have the frame ea...

Страница 25: ...tures and swivelling jib 3 Climbing equipment The contractor must ensure that 1 Storage facilities whose upper edges are more than 1 m above the floor and must be mounted for regular operational work...

Страница 26: ...the filling couplings 8 1 General instructions Look after the accessibility of the filling nozzle s Make sure that that you have an adequate access road to your storage system 3 m width and 4 m headro...

Страница 27: ...centered on the narrow side of the silo 8 3 Filling with two filling nozzles From a frame width of 2 5 m silos are equipped with a second filling nozzle In this case a better filling level will be rea...

Страница 28: ...th 230V and 16A protection must be accessible outside the storage room This power connection can be used for a possible suction blower Note before filling Switch off the heating system prior to starti...

Страница 29: ...and the hose length The filling pressure should be between 0 3 bars for a hose length of about 10 m and 0 6 bars for a hose length of about 30 m The required filling pressure and air flow rate can var...

Страница 30: ...be bolt together with the lifting bar o The filling pipes must be bolt together among each other by clamping rings so that no rotation occurs o The filling coupling must be easily accessible without...

Отзывы: