4B - W4005 BÜHLER ELEVATOR MONITORING SYSTEM R9.6 – 22 May 2020
Page
42
of
48
15.
Commissioning
DANGER:
EXPOSED BUCKETS AND MOVING PARTS WILL CAUSE SERIOUS INJURY OR
DEATH. THE OPERATOR MUST ALWAYS LOCKOUT POWER BEFORE REMOVING COVER OF
THE INSPECTION DOOR OF THE ELEVATOR OR PERFORMING ANY INSTALLATION OR
MAINTENANCE WORK.
DANGER:
ALL ELECTRICAL POWER TO THE SYSTEM AND WIRING MUST BE ISOLATED PRIOR
TO STARTING ANY INSTALLATION OR MAINTENANCE WORK. WORKING ON OPEN LIVE
CIRCUITS IN ATEX ZONES IS PROHIBITED AND CAN LEAD TO AN EXPLOSION.
1)
Please follow steps 1 to 7 of the 14
section of this manual
2)
Calibrate the W4005NV46AI /B controller as explained in section 10.14 - W4005NV46AI /
3)
Perform the normal machine start / stop sequence as explained in section 10.17 - Normal Machine
Start / Stop
4)
Perform the alarm shutdown sequence as explained in section 10.18 - Alarm Shutdown Restart of
this manual
16.
System Breakdown Procedure
In the event of the W4005V46-SYSx /B system or any part of it not operating correctly, the machine must be
stopped immediately, and the system repaired or replaced. The system must then be re-commissioned and
verified to be working correctly. Please refer to 13 -
If the user decides to bypass the W400 system and operate without protection, the machinery is not
protected against explosion risks and the end user takes all the responsibility for this action.
17.
Manufacturer Information
System Component
Manufacturer
Authorised Reseller
W4005NV46AI /B
Don Electronics
4B Group
TS1V4AI /B
Don Electronics
4B Group
P300V34AI /B
Synatel
4B Group
WG4A-BR /B
Synatel
4B Group
ADB910V3AI /B
Don Electronics
4B Group
W400-CG-KIT /B
Don Electronics
4B Group
W400-BSA-KIT/B
Don Electronics
4B Group
Table 29 - Manufacturer Information
17.20
Manufacturer Detailed Information
Don Electronic Ltd
Westfield Industrial Estate
Kirk Lane, Leeds
LS19 7LX
UK
Synatel Instrumentation Ltd.
Walsall Road, Norton Canes
Cannock, Staffordshire
WS11 9TB
UK
Содержание W4005V46-SYS/B Series
Страница 45: ...4B W4005 B HLER ELEVATOR MONITORING SYSTEM R9 6 22 May 2020 Page 45 of 48 This page is intentionally left blank...
Страница 46: ...4B W4005 B HLER ELEVATOR MONITORING SYSTEM R9 6 22 May 2020 Page 46 of 48 This page is intentionally left blank...
Страница 47: ...4B W4005 B HLER ELEVATOR MONITORING SYSTEM R9 6 22 May 2020 Page 47 of 48 This page is intentionally left blank...