3nStar Inc.
PTA0156 User Manual
2 |
P a g e
2.
Initial Installation
1. Unpacking
Immediately after receiving the machine, unpack and check for any damage. In case of damage, the
shipping company shall be informed immediately report the claim to the manufacturer. After unpacking
also check the that the spare parts are complete.
2. Preparing for Installation
Examine the case for cleanliness, Logos, marks and insure labeling is correct.
Check the working environment: Because the POS is a precision instrument, the working environment
should be checked and make sure it is suitable for the cash register. If the work environment is not
sufficient, please do not make use of the POS.
3. The main technical specifications
Power supply voltage:
220VAC
~
± 15%
Power: 80W ± 15%
Frequency: 50—60Hz
Operating Temperature:
0
℃
~ 40
℃
Storage: -20
℃
~ +55
℃
Relative humidity:
20% ~ 93% (40
℃
)
4. Preparing for use
1) Place the machine on a flat surface and ensure that the cabling is neat and sufficient. Insert the power
connector in the appropriate socket.
2) Power on the machine (note: stable power source and ground is important).
3) Android OS is installed by default on the POS unit.
Содержание PTA0156
Страница 1: ...15 6 Android POS System USER MANUAL PTA0156...
Страница 6: ...3nStar Inc PTA0156 User Manual 4 P a g e 3 Product Measurement PTA0156 Single Screen...
Страница 7: ...3nStar Inc PTA0156 User Manual 5 P a g e PTA0156 Dual Screen...
Страница 8: ...3nStar Inc PTA0156 User Manual 6 P a g e 4 Product Appearance Single Screen Front Back...
Страница 9: ...3nStar Inc PTA0156 User Manual 7 P a g e Dual Screen Front Back...