
12
78-8135-6695-3-C
11.8 Route fiber into tray to determine the amount of
buffer tube to remove. Remove buffer tube and clean
fiber as required.
11.9 Cut a 1” (25 mm) long section of the rubber gripper
supplied with the splice tray kit and use to secure
buffer tubes or ribbon fiber (up to six) to tray.
11.10 Group up to four pigtails per rubber gripper to be
spliced and route and install in tray.
11.11 Splicing can be done with the splice tray mounted
inside the storage tray (recommended for ribbon
splicing) or can be removed.