15
Table 2 – Inspection & Maintenance Log
Serial Number(s):
Date Purchased:
Model Number:
Date of First Use:
Inspected By:
Inspection Date:
Component:
Inspection:
Before
Each Use
Competent
Person
Hooks
(Figure 14)
Inspect Snap Hooks, Carabiner, Rebar Hooks, etc. for signs of damage, corrosion, and proper working
condition. Where present: Swivels (A) should rotate freely, and Carabiner and Hook Gates (B) should
open, close, lock, and unlock properly. Inspect Rope Grabs (C) per the instructions included with the
Rope Grab or Vertical Lifeline.
Web Lanyards
Webbing and Stitching
(Figure 15
Inspect webbing; material must be free of cuts (A), frays (B), or broken fibers. Check for tears,
abrasions, heavy soiling (C), mold, burns (D), or discoloration. Inspect stitching; Check for pulled or
cut stitches. Broken stitches may be an indication that the harness has been impact loaded and must
be removed from service.
Energy Absorber
(Figure 16)
Verify that the integral Energy Absorber has not been activated. An open cover (A) or torn cover (B),
webbing pulled out of the cover (C), torn or frayed webbing (D), and ripped or missing stitching (E).
are indicators of an activated Energy Absorber.
Tubular Web
Impact Indicator Label
(Figure 17)
Inspect Tubular Web Lanyards for impact indication. If the webbing is torn, revealing the Impact
Indicator Label, the Lanyard has experienced impact loading and must be removed from service and
destroyed.
Labels (Figure 18)
All labels should be present and fully legible.
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Corrective Action/Maintenance:
Approved By:
Date:
Содержание DBI SALA Pro Series
Страница 5: ...5 6 7 A B C 8 A B 9 1 2 3 ...
Страница 6: ...6 10 A ü B ü C D 11 12 A B C ...
Страница 7: ...7 13 14 B A B B B C 15 16 17 A B C D C C B A D E ...