Table 2 – Inspection and Maintenance Log
Inspection Date:
Inspected By:
Components:
Inspection:
(See Section 5 for
Inspection Frequency
)
User
Competent
Person
Jib Boom
(Figure 2)
Inspect the entire system for damage, deformation, corrosion, and rust. Look
for cracks, bends, dents, or wear that could affect strength and operation of the
system.
Inspect all fasteners for damage or corrosion. Tighten as necessary.
Inspect all moving parts for chips, cracks, breaks, or worn areas that can cause
malfunction during operation.
Verify that all adjustment points (pins, bolts, tri-screws, adjusting screws, etc.)
are in full functional condition and are adjusted properly.
Fully lower the Jib Boom to take tension off the cable. Verify that the springs in
the Lower Pulley (I) are functional and free of rust or other obstructions. Verify
that the cable of the Adjustment Winch (G) has no frays or tearing. Ensure the
locking assembly engages.
Winch Assembly
Inspect the Winch Assembly per 3M instruction manual 8511324.
Rollers and Bearings
(Figure 12)
Grease the Rollers (A) and Bearings (B) of the Adjustable Upright Assembly for
B1 Jib Boom models. Ensure that all Roller locations are greased.
Anchor Connection
Points
Ensure Anchor Connection Points are free of corrosion, cracks, or other
imperfections that my cause malfunction during operation.
Labels
(Figures 13 and 14)
Verify that all labels are present and fully legible.
Fall Protection
Equipment
Additional Fall Protection equipment that is used with the product should be
installed and inspected per the manufacturer instructions.
Serial Number(s):
Date Purchased:
Model Number:
Date of First Use:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Содержание DBI SALA Flexiguard M100
Страница 2: ...2 2 A B C D E G H J K F G I K H H K K A M F C D E L L N N N N 3 4 A ...
Страница 3: ...3 5 6 A B C D E F G A B C 7 A A A A A B A 1 2 3 4 ...
Страница 4: ...4 7 C A B 360 A A A B X 0 5 6 ...
Страница 5: ...5 8 B A B A B C H R L X X 1 2 3 ...
Страница 6: ...6 9 A B A 10 C A B B A C B A C 1 2 3 1 2 3 ...
Страница 7: ...7 10 A B C T 75 ft lb 102 N m A B C C A B B A B A 4 5 6 7 8 ...
Страница 8: ...8 10 A B x2 11 A B 9 1 ...
Страница 9: ...9 11 A B A B 12 A 1 3 A 3 1 2 2 A B A B 2 3 ...