4 .8 Ensure the funnel is in the forward-most position .
4 .9 Lay the fiber into the fiber holder tool and close all
three doors . DO NOT LATCH THE CLAMP .
clamp
middle cover
funnel cover
4 .10 While holding slight pressure on the clamp, draw
the fiber back to align the edge of the buffer with
the hole in the funnel-shaped fiber guide .
Edge to buffer aligning
with the hole .
4 .11 Latch the clamp to secure the fiber in position .
4 .12 Insert the fiber holder in the cleaver laying the
fiber between the two pins . Slide the holder
forward until it stops .
4 .13 Slide the funnel assembly back until it hits the
stops on the fiber tool .
4 .14 Verify the fiber has no bow, is between the guide
pins, and that the 900 μm buffer is flush with the
edge of the pin closest to the cleaver blade .
6
78-0015-4562-9-A
April 2018