![3M 7620-S-2 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/3m/7620-s-2/7620-s-2_instructions-manual_442550007.webp)
78-8117-0508-2 Rev D
7
6.2 Connect ground braid to system ground according to standard practice.
Semi-Con Insulation Shield
Ridge at End of Cable
Insulation Shield (Semi-Con)
Ridge at End of Stress
Controlling Compound
Correct Installation of Termination on Tape Shielded Cable
Cable Insulation
Conductor
Vinyl Tape
Marker
Environmental Top
Seal
Stress Controlling Compound
Silicone Rubber Tube