12
8.16 Continuously push PST downward while pulling the rest of the
core material.
8.18 For pedestal closure applications, secure the closure to pedestal,
mount terminal block and connect ground wires according to
system practice.
8.17 When the PST is in place, remove the core wrap from around the
cable.
8.12 Slide PST over closure so that the PST tail is pointed toward the
top of the closure. The core tail MUST be unwound upward.
Position PST bottom edge within 0.5" (13 mm) of the bottom of the
base.
Note:
Optional method is to put closure over the splice bundle
and position PST 2" (51 mm) below the gel end seal. While
holding the PST and closure with one hand, unwind the
core by pulling on the core tail with the other hand in an
upward and outward COUNTERCLOCKWISE direction.
8.13 While holding the PST and closure with one hand, unwind the core
by pulling on the core tail with the other hand in an upward and
outward COUNTERCLOCKWISE direction until approximately 2.0"
(51 mm) of the PST is shrunk onto the closure.
8.14 Place assembly over splice and onto gel end seal. Insure the
wireform latch and the 3M logo are facing forward. Mate the plate
with the base.
8.15 Push PST towards bottom of closure. This will invert the PST.
Содержание 4604
Страница 1: ...June 1998 34 7045 6337 7 A Re enterable PST Dome Closure Instructions ...
Страница 2: ...2 ...
Страница 15: ...15 ...