![background image](http://html1.mh-extra.com/html/3m/3m-matic-accuglide-3-200a/3m-matic-accuglide-3-200a_instructions-and-parts-list_442712027.webp)
5-SHIPMENT-HANDLING-STORAGE, TRANSPORT
15
5.1 Shipment and Handling of Packed Machine
- The machine is fi xed on the pallet with four (4) bolts
and can be lifted by using a fork truck.
- The package is suitable to travel by land and by air.
- Optional sea freight package is available.
Packaging Overall Dimensions
(Figure
5-1)
See
Specifi cations.
During the shipment it is possible to stack a
maximum of 2 machines
(Figure 5-2).
5.2 Packaging for Overseas Shipment
(Optional
-
Figure 5-3
)
The machines shipped by sea freight are covered by
an aluminum/polyester/polythene bag which
contains dehydrating salts.
5.3 Handling and Transportation of Uncrated
Machine
The uncrated machine should not be moved except for
short distances and indoors ONLY. Without the sup-
porting pallet, the machine is exposed to damage and
may cause injuries. To move the machine use belts or
ropes, paying attention to place them in the points in-
dicated using care to not interfere with the lower taping
head
(Figure 5-4).
5.4 Storage of the Packed or Unpacked Machine
If the machine is not used for a long period,
please take the following precautions:
- Store the machine in a dry and clean place.
- If the machine is unpacked it is necessary to
protect it from dust.
- Do not stack anything over the machine.
- It is possible to stack a maximum of 2 machines
(if they are in their original packing).
H
L
W
Figure 5-1
Figure 5-2
Figure 5-3
Figure 5-4
2009 February
H
L
W
200a-NA
Содержание 3M-Matic AccuGlide 3 200a
Страница 4: ...THIS PAGE IS BLANK ...
Страница 6: ...THIS PAGE IS BLANK ...
Страница 8: ...8 THIS PAGE IS BLANK ...
Страница 10: ...THIS PAGE IS BLANK ...
Страница 46: ...34 THIS PAGE IS BLANK ...
Страница 48: ...36 THIS PAGE IS BLANK ...
Страница 49: ...37 16 TECHNICAL DIAGRAMS 16 1 Electric Diagram 200a NA 2009 February ...
Страница 50: ...38 THIS PAGE IS BLANK ...
Страница 52: ...40 THIS PAGE IS BLANK ...
Страница 54: ...42 THIS PAGE IS BLANK ...
Страница 62: ...50 2009 February 200a NA 3 11 14 13 15 8 9 4 2 1 7 6 5 6 6 10 1 2 12 10 Figure 2798 200a ...
Страница 72: ...60 14 12 5 5 6 8 9 7 7 6 3 13 11 1 2 10 4 8 8 8 2009 February 200a NA Figure 5593 200a ...
Страница 76: ...64 THIS PAGE IS BLANK ...
Страница 78: ......
Страница 80: ...THIS PAGE IS BLANK ...
Страница 82: ...THIS PAGE IS BLANK ...
Страница 86: ...2 THIS PAGE IS BLANK ...
Страница 91: ...7 AccuGlide 3 Taping Head 2 2009 February Figure 2 1 Dimensional Drawing Specifications ...
Страница 110: ...8 9 6 4 3 7 7 7 7 7 7 1 2 5 26 Figure 10919 Upper Head AccuGlide 3 Taping Head 2 2009 February ...
Страница 112: ...1 5 4 9 9 4 5 3 8 7 7 28 Figure 10923 Upper and Lower Heads AccuGlide 3 Taping Head 2 2009 February 6 6 ...
Страница 120: ...10 8 5 4 3 9 9 9 9 9 9 1 2 7 11 36 Figure 10920 Lower Head AccuGlide 3 Taping Head 2 2009 February 9 ...
Страница 122: ...38 THIS PAGE IS BLANK ...
Страница 123: ...39 ...
Страница 124: ...40 ...