24
12-OPERATION
12.1 Operator's Correct Working Position and
Operational Flow (Figure 12-1).
12.5 Box Size Adjustment
Repeat all the operations shown in
Section 11 - Buildup and Adjustments.
12.6 Cleaning
Before carrying out any cleaning or maintenance
operation stop the machine by turning the main ro-
tary switch to OFF and disconnect the electric power
(Figure 12-3).
12.8 Safety Devices Inspection
1 Taping units blade guard
2 Latching emergency stop button
3 STOP (OFF) turn rotary switch on main power.
Operator
Qualifi cations
1 Tape loading and threading
1
2 Tape web alignment
1
3 Adjustment of one way tension roller
1
4 Adjustment to box size (H and W)
1
5 Adjustment of tape applying spring
1
6 Conveyor bed height adjustment
1
7 Special Adjustment-Changing tape leg length 2
8 Special Adjustment-Column re-positioning
2
12.7 Table of Operation Adjustments -
12.2 Starting the Machine
Important:
Before starting the machine, verify
that no tools or other objects are
on the conveyor bed.
Turn the main rotary switch ON after the EMER-
GENCY BUTTON is released
(Figure 12-3).
12.3 Starting Production
After having adjusted the machine according to the
box dimensions (height-width), let the machine run
without cartons and check its safety devices. Then
start the working cycle.
Figure 12-1
2011 April
a80b-NA
Figure 12-1
Figure 12-3
12.4 Tape Replacement and Threading
Skill 1 - Operator
See MANUAL 2:
AccuGlide™ 2+
STD 2 Inch or 3 Inch Taping Heads
.
Press the LATCHING EMERGENCY STOP BUTTON.
•
To reduce the risk associated with sharp
blade hazards:
−
Keep hands and
fi
ngers away from tape
cutoff blades under orange blade guards.
The blades are extremely sharp.
WARNING
Once the box has been
fi
lled, close its top
fl
aps and
push it between the side drive belts. Always keep
hands in position (as shown in
Figure 12-2).
The box will be automatically sealed with adhesive
tape on the bottom box seam.
Figure 12-2
Hand Position
Содержание 3M-Matic a80b
Страница 4: ...THIS PAGE IS BLANK ...
Страница 6: ...6 THIS PAGE IS BLANK ...
Страница 8: ...THIS PAGE IS BLANK ...
Страница 42: ...32 THIS PAGE IS BLANK ...
Страница 43: ...33 2011 April a80b NA 16 TECHNICAL DIAGRAMS continued 16 1 Electric Diagram ...
Страница 46: ...36 THIS PAGE IS BLANK ...
Страница 47: ...37 2011 April a80b NA a80b Figure 10915 Figure 10914 Frame Assemblies Figure 10916 Figure 10865 ...
Страница 56: ...46 2011 April a80b NA Figure 10916 a80b ...
Страница 58: ...48 THIS PAGE IS BLANK ...