THERMOSALD ISC – MANUAL QUICK START
Rev. 2010 / 03
Manual cod.: 3ES080x_V5.1_QS_EN Page Nr. 10 Tot. Nr . 20
Includes all previous models
4.2 - PUTTING THE SYSTEM INTO SERVICE – BASIC SETUP (+RS485 OPTION)
Step 1 – Calibrate the system after performing the steps indicated in paragraph 4.1.
Step 2 – The machine should be at ambient temperature
Step 3 – The pre-heat and heat-sealing controls should be inactivated
Step 4 – Power up the temperature controller
Step 5 – In the event of faults (the Red ALARM Led lights up), follow the instructions given on the temperature regulator
and put the faults right as required (the id. number of the fault can be found by multiplying the pulses emitted by the green
Balance Led by 10 (e.g. 9 pulses= 90) + the pulses of the red Balance Led by the units (e.g. 10 pulses =0)
Step 6 – Calibrate the system. Keep the external CALIBRATION button pressed for 3 seconds and wait (the four LEDS on
the system go on flashing as long as the the instrument is being calibrated).
Step 7 – The system is ready to start cycling as soon as the calibration procedure has been completed. Set the Heat-Sealing
and Pre-Heat temperature by using the respective potentiometers (for resolution see technical note paragraph 4.1).
WARNING – If calibration problems arise, perform a MASTER RESET procedure starting from stage 5 ( to perform the
MASTER RESET procedure, keep the external RESET + CALIBRATION buttons pressed for 6 seconds; the 4 Leds on the
equipment stay on for 3 seconds).
PRE-HEAT
POTENTIOMETER
HEAT-SEALING
POTENTIOMETER
CLEAR FAULTS/RESET
BUTTON
CALIBRATION BUTTON