![3DHISTECH iSaCS Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/3dhistech/isacs/isacs_user-manual_442156037.webp)
iSaCS – IHC Stainer, Automated Coverslipper and Scanner
User's Guide
5 Scheduling
5 Scheduling
Important!
Do
NOT
open any of the doors during scheduling, because all of the
slide data will be lost!
Scheduling can be executed based on the following aspects:
Quick
/
Moderate
/
Intense
•
Sequence of slides are varied so that after rescheduling a 100-cycle calculation process is run,
then the slide that can be finalized the fastest will be the first in the queue.
Simple
/
Advanced
/
Complex
•
Simple
– Does not interrupt the protocol, one slide is finalized at a time.
•
Advanced
/
Complex
– Interrupts the protocol (one unit from pipetting to washing). When
selecting
Complex
, a slide is finalized in each 5 minutes.
The selection of the upper three options (
Quick
/
Moderate
/
Intense
) is not mandatory, the process
can be launched after selecting one of the options
Simple
/
Advanced
/
Complex
.
Click
to display the scheduler visualization diagram.
September 22, 2016
3DHISTECH Ltd.
37(51)