PREPARATION AND SETUP
4.1 Arranging the Workspace
Choose a stable, level workspace to install and operate the Density. Reserve the following minimum dimensions for the most
convenient access:
• Width: 100 cm / 39.3 inch
• Depth: 100 cm / 39.3 inch
• Height: 220 cm / 86.6 inch
Place the Density’s back at least 10 cm / 3.9 inch from the closest object. It is necessary to place the Density in a way that allows
you to be able to pull the plug from the machine or power outlet.
4.2 Water
The machine shall be filled with 20±2 liters of tap water before turning the system on. This is done by pouring water into the
blasting chamber.
Figure 1: Pour 20 liters of water straight into the blasting chamber.
On the panel on the front, there is a water level indicator. When the indicator is red the machine needs to be filled with water to
be able to shoot water. When the indicator is fully green the machine is full, please do not overfill as it will reduce the machine's
capacity.
The indicator behavior is not linear so be careful when filling with water as the level indication can change quickly.