11.
Assemble (8) 2-section yokes
to be used as support straps from 360 Y-
DROP boom to left & right upper sprayer boom, shown in FIG 8. Note:
Length will need to be adjusted to fit distance between booms.
1.
(2) 23” Yoke straps
2.
(4) Yoke ends
3.
(4) 3/8” x 1-1/4” carriage bolts
4.
(2) 3/8” x 1-1/4” bolts
5.
(6) 3/8” flat washers
6.
(6) 3/8” lock washers
7.
(6) 3/8” nuts
8.
(2) 3.5” locking clip pin
FIG 8
Содержание 360 Y-DROP
Страница 1: ...2015 360 Y DROP ASSEMBLY INSTRUCTIONS CASE 80 90 BOOM ...
Страница 6: ...FIG 4b FIG 4c ...
Страница 12: ...2 SecHon Yokes FIG 10b ...
Страница 14: ...16 Assemble drag hoses to 360 Y DROP base unit shown in FIG 12 using hose clamps provided FIG 12 ...
Страница 17: ......