![360 YIELD CENTER 360 Y-DROP Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/360-yield-center/360-y-drop/360-y-drop_assembly-instructions-manual_440300005.webp)
3.
Install remainder of the mounting brackets in Zones 2 through 5
and leave loose,
shown in FIG 3
:
1.
One (1) 6” z-slider bracket
2.
Two (2) 5” plates
3.
Two (2) 3/8” x 4” bolts
4.
Four (4) 3/8” flat washers
5.
Two (2) 3/8” lock washers
6.
Two (2) 3/8” nuts
4.
Space all five sets of mount brackets nominally 60” apart, fold
boom to check clearances and tighten.
Distances between
brackets may vary, depending on your specific boom. Be sure to
take into account where your drops will fall.
5.
Repeat STEPS 2 - 4 on the other boom fold.
6.
Install two (2) mounting brackets on center section and tighten,
right side is
shown in FIG 4a, 4b & 4c:
1.
Two (2) 6” z-slider brackets
2.
Four (4) 6” plates
3.
Four (4) 4.5” bolts
4.
Eight (8) 3/8” flat washers
5.
Four (4) 3/8” lock washers
6.
Four (4) 3/8” nuts
FIG 3
6” z-‐slider
5” plate
FIG 4a
6” top plate
6” z-‐slider
Содержание 360 Y-DROP
Страница 1: ...2015 360 Y DROP ASSEMBLY INSTRUCTIONS CASE 80 90 BOOM ...
Страница 6: ...FIG 4b FIG 4c ...
Страница 12: ...2 SecHon Yokes FIG 10b ...
Страница 14: ...16 Assemble drag hoses to 360 Y DROP base unit shown in FIG 12 using hose clamps provided FIG 12 ...
Страница 17: ......