![360 YIELD CENTER 360 Y-DROP Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/360-yield-center/360-y-drop/360-y-drop_assembly-instructions-manual_440300013.webp)
14.
Assemble riser mount brackets to square boom with stainless steel
hardware provided and leave loose,
shown in FIG 11. Quantity and spacing
will depend on your system configuration and application profile.
1.
Riser mount brackets
2.
5/16” x 1-3/8” U-Bolts
3.
5/16” flat washers
4.
5/16” lock washers
5.
5/16” nuts
15.
From center of machine, measure appropriate distance, based on row
spacing and tighten u-bolts on riser mount brackets.
FIG 11
FIG 5
Содержание 360 Y-DROP
Страница 1: ...2015 360 Y DROP ASSEMBLY INSTRUCTIONS CASE 80 90 BOOM ...
Страница 6: ...FIG 4b FIG 4c ...
Страница 12: ...2 SecHon Yokes FIG 10b ...
Страница 14: ...16 Assemble drag hoses to 360 Y DROP base unit shown in FIG 12 using hose clamps provided FIG 12 ...
Страница 17: ......