![2VV FINESSE Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/2vv/finesse/finesse_installation-instruction_440015011.webp)
11
2VV.
Creating innovative solutions for you and your business since 1995.
Electric connection – Option 2:
CP 1
CP 2
CP 1
CP 2
CANH
CANL
GND
+12V
ON
ON
ON
ON
Electric connection – Option 2:
OFF
OFF
4. CONTROL PANEL’S
The address is set for each control, which then addressed
according to it.
Ad 1)
Ad 1)
– Sets the CAN address of the control panel so up to 2 control panels
may be connected to the MASTER regulator
Options: CP 1 = control panel’s address is 1
CP 2 = control panel’s address is 2
Electric connection – Option 1:
CP 1
CP 2
CAUTION!
Each panel must have its own address,
otherwise it may result in the malfunction of the regulator.
Terminals must be set if multiple panels are to be connected. They are found in the main electronics
and the controller:
Terminal settings
Example of controller connection – Option 1:
ON
ON
CP 1
CP 2
ON
ON
ON
ON
OFF
OFF
Содержание FINESSE
Страница 1: ...FINESSE STANDESSE SUPERIOR control Installation instruction EN v 1 20 05 20 ...
Страница 2: ......