![2gig Technologies GO!control 2GIG-CNTRL2 Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/2gig-technologies/go-control-2gig-cntrl2/go-control-2gig-cntrl2_user-manual_439614033.webp)
31
System Toolbox
Date Range User Access Schedule
1.
Select
DATE RANGE
for
the schedule type.
2.
Press the calendar button to
view the Date Range User
Access Schedule Screen.
3.
Press the fi rst day button to set
the month, day, and year that this
User Code will
fi rst
be valid.
4.
Press the last day button to set
the month, day, and year that this
User Code will
last
be valid.
5.
Press the left and right time buttons
to set the starting and ending
times that this User Code will be
valid during the date range.
6.
Press
OK
to accept the schedule,
or
CANCEL
to return to the
Schedule Type Screen.
Deleting User Access Schedules
1.
On the User Management Screen,
select a User Code that displays
the calendar schedule icon.
2.
Press the
EDIT SCHEDULES
button.
3.
On the User Access Schedules Screen,
select the schedule to delete.
4.
On the Schedule Type Screen
press the
DELETE
button.
5.
A confi rmation screen will be
displayed to verify you really want
to delete the User Access Schedule.
If OK, press
DELETE SCHEDULE
or press
CANCEL
to return to the
User Access Schedule Screen.
6.
A second screen confi rms that the
schedule was deleted. Press
OK
.
Schedule Set for Date Range
Date Range Schedule Selected
User 2 with Date Range Schedule
Delete Schedule Confi rmation Screen
Press to Delete Schedule
Selecting Schedule to Delete