1-CUBE SU 6.2. Скачать руководство пользователя страница 13

 

13

6.

 

M

ONITORING 

RS232 

During all the methods 

Heating Immersion Circulator

 

the records of the temperature curves in PC are possible. Switch 

off the device and connect the PC com port with the RS232 com port with the help of supplied communicating cable. 
Switch  on  the  device  and  start  any  method.  Use  any  program  which  makes  possible  the  RS232  communication  to 
record the temperatures in PC. Program Hyperterminal (which is part of WINDOWS) or program Serial Watcher (which 
is  part  of  Monitoring  Mash  Bath  supply)  can  be  used.  Note.  It  is  necessary  to  adjust  the  program  for  ASCII  signs 
reception.    

 

7.

 

M

AINTENANCE

 

Throughout  the  operation  the  scale  can  be  sedimented  on  the  heating  elements.  It  is  important  to  remove  these 
sediments.    Pour  the  water  with  either  the  acetic  acid  or  citric  acid  into  the  bath  and  heat  up  and  hold  the 
temperature of 65 degrees Celsius for one hour in the bath. Then disconnect feed el.cord out of the socket, suck the 
sediments with the help of a hose and clean the vessel.  

8.

 

I

MPORTANT WARNINGS

 

The Cooling Bath must be always located on the nibs and mustn’t be tilted or turned upside down 
in any case!!!! 

If  the  device  is  transported  at  temperature  below freezing point, it is necessary to leave the instrument for about 2 
hours at room temperature before you start to work with it.   

The fuses are located on the back panel of the Water Bath.  It is forbidden to replace the fuse by fuse with different 
value than the value indicated on the equipment.  

Service: 

For service contact the manufacturer: 

 1-CUBE,  Hamry 3567, 580 01 Havl.Brod, Czech Rep.      

 

tel. 00 420- 569 433 620  

 

fax .00 420-569 422 144

  

 

[email protected] 

NOTICE:

 It is forbidden for anyone except for the manufacturer or authorized company to repair the apparatus. 

At the end of the apparatus life we recommend that it is according to corresponding waste categorization.  

Take  the  metallic  parts  made  of  iron,  brass,  plastic  elements  and  packing  material  to  the  separated  collection  as  a 
secondary raw material. You can also order the apparatus liquidation at the above mentioned company that ensures 
the liquidation of the waste according to Waste Act. 

 

Содержание SU 6.2.

Страница 1: ...ube com WATER THERMOSTAT TYPE SU 6 2 USER S GUIDE Manufacturer and service 1 CUBEs r o Hamry 3567 580 01 Havl Brod tel 569 433 620 fax 569 422 144 CONTENT 1 Range of the supply 2 2 Installation instructions 2 3 Safety recommendations 3 4 Technical data 4 5 User s guide 5 6 Monitoring RS232 13 7 Maintenance 13 8 Important warnings 13 ...

Страница 2: ...sition for proper operation of the apparatus Plug the Bath with the help of 2 standardized single phase plugs into el socket Connect each bath cold and hot with its own cord Before plugging in the technician has to check the condition of the el circuit that will be used for the Water Bath operation If the result of the el circuit inspection is positive the Water Bath can be plugged in Plug wiring ...

Страница 3: ... condition of the el circuit that will be used for the Water Bath operation If the result of the el circuit inspection is positive the Water Bath can be plugged in There is the Main Switch located on front panel The Main Switch has two positions ON 1 OFF 0 In case of danger switch off the Main Switch and disconnect feed el cord out of the socket Switch off the Main Switch disconnect feed el cord o...

Страница 4: ... 16A circuit breaker Adjustable data type of method THERMOSTAT PROFILE CALIBRATION temperature range from 25 0 C to 90 0 C cold bath from 10 0 C to 30 0 C with the help of membrane keyboard and display time since the begining of test Accuracy accuracy of temperature measurement 0 01 0 C accuracy of temperature regulation 0 1 0 C Data represented on LCD display type of method THERMOSTAT PROFILE ins...

Страница 5: ...ectrically conductive liquid If wou use non electrically conductive liquid then the device will notify all the time that there is not enough water inside the bath even if it isn t true If you use distilled water in the laboratory just add a pinch of salt NaCl and you will get electrically conductive liquid Switch on the cooling on off switch except for the main switch in the cooling bath There is ...

Страница 6: ...r will be controlled switch on switch off with Main switch Once the main switch is switched on the stirrer is switched on automatically too One chip microprocessor is used to control the device The algorithm is saved in the program Program is controlled with the help of 7 keys of the membrane keyboard which is located on the front panel of the equipment The report about the operating condition can...

Страница 7: ...he text THERMOSTAT appears on the display Once you finish working switch off the device with the help of the Main switch Control algorithms The following control algorithms PROFILE THERMOSTAT CALIBRATION can be run with the Water Bath During the process the following information are automatically displayed on the display 1 line The required temperature is displayed 2 line Information about time gi...

Страница 8: ... display and it will disappear once the water is added Method PROFILE This algorithm allows to adjust any required time behaviour of temperatures It is possible to adjust as many as 7 points defined with time and temperature coordinates After choice of the item PROFILE in the main menu with the help of the key ROTATION one can start the algorithm itself by pressing the key ON After 1 sec the text ...

Страница 9: ... point 5 80 time of point 6 105 time of point 7 125 temperature of point 1 30 temperature of point 2 30 temperature of point 3 34 temperature of point 4 34 temperature of point 5 40 temperature of point 6 40 temperature of point 7 25 Method Calibration It is necessary to check the measurement accuracy with the help of etalon once in a six months If the temperature of the bath does not correspond t...

Страница 10: ...e first line now and the value on the second line Do not set the point 2 at this moment therefore press the key OFF 6 There is text point 2 temp on the first line now and the value on the second line Do not set the point 2 at this moment therefore press the key OFF 7 There is text HYSTER1_0 on the first line now and the value on the second line Do not set HYSTER1_0 at this moment therefore press t...

Страница 11: ...n the first line now and the value on the second line Overwrite the value with the help of keys increase or decrease to put the value that you have measured before with the etalon in the water of the water bath Press the key OFF to set the required value 7 There is text HYSTER1_0 on the first line now and the value on the second line Do not set HYSTER1_0 at this moment therefore press the key OFF ...

Страница 12: ...R1_0 as required Press the key OFF to set the required value Hysteresis HYSTER1_0 is preadjusted by the manufacturer as 000 30 8 There is text HYSTER1_100 on the first line now and the value on the second line Overwrite the value with the help of keys increase or decrease to adjust HYSTER1_100 as required Press the key OFF to set the required value Hysteresis HYSTER1_0 is preadjusted by the manufa...

Страница 13: ... help of a hose and clean the vessel 8 IMPORTANT WARNINGS The Cooling Bath must be always located on the nibs and mustn t be tilted or turned upside down in any case If the device is transported at temperature below freezing point it is necessary to leave the instrument for about 2 hours at room temperature before you start to work with it The fuses are located on the back panel of the Water Bath ...

Отзывы: