background image

Hercules U26

Návod k obsluze

VIADRUS HERCULES U 22 BASIC

MANUAL FOR BOILER OPERATION

AND INSTALLATION

Summary of Contents for HERCULES U 22 BASIC

Page 1: ...Hercules U26 Návod k obsluze VIADRUS HERCULES U 22 BASIC MANUAL FOR BOILER OPERATION AND INSTALLATION ...

Page 2: ... possibilities 8 5 Order delivery and assembly 10 5 1 Order 10 5 2 Delivery and accessories 10 5 3 Assembly procedure 10 6 Putting into operation instructions for a contractual service organization 13 6 1 Control operation before starting 13 6 2 Putting the boiler into operation 13 7 User s boiler service 14 8 IMPORTANT NOTICE 15 9 Maintenance 15 10 Instructions for product liquidation after its o...

Page 3: ...ectional size of the boiler VIADRUS HERCULES U 22 BASIC is appropriate for heat source reconstruction in self contained flats for smaller residential and recreational facilities Bigger sizes of the boiler meet the requirements of heating the family houses shops schools etc The boiler is manufactured in warm water design with both natural and forced heating water circulation and working overpressur...

Page 4: ...level of 65 dB A Minimum chimney draught mbar 0 14 0 16 0 18 0 20 0 22 0 24 0 26 0 28 Boiler connections heat water DN 50 returnable water DN 50 Chart Nr 2 Heat technical parameters of the boiler granularity 30 60 mm heating value 26 30 MJ kg 1 coke and antracite humidity 15 25 heating value 12 15 MJ kg 1 wood Section number pcs 3 4 5 6 7 8 9 10 Rated power kW 17 7 23 3 29 1 34 9 40 7 46 5 52 3 58...

Page 5: ...5 Section number 3 4 5 6 7 8 9 10 L 328 424 520 616 712 808 904 1000 L1 682 5 778 5 874 5 970 5 1066 5 1162 5 1258 5 1354 5 Ø D 156 156 156 156 156 156 176 176 Fig no 2 Main dimensions of boiler ...

Page 6: ...ing to the average up to 220 mm then sections without a molding in the back part with a molding The molding closes the burning space and carries back the flame and product of consumption from the back space to the front part of the boiler i e by the back path in smoky draughts it is perfectly taken advantage of the product of consumption heat Chart Nr 3 Medium sections of the boiler Section number...

Page 7: ...oker door 3 Ash door 4 Smoky chimney pot 5 Boiler drum insulation 6 Jacket 7 Thermomanometer 8 Sealing Ø 90 x 60 x 3 9 Heat water flange 10 Returnable water flange 11 Filling and draining cock Fig no 3 Main parts of boiler ...

Page 8: ...f construction products and building elements Part 1 Classification using test data from reaction to fire tests d to the system of HWS heating ČSN 06 0320 Heating systems in buildings Hot water preparation Designing and planning ČSN 06 0830 Heating systems in buildings Safety devices ČSN 75 5409 Water installations inside buildings 4 2 Placing possibilities Boiler positioning in the living space i...

Page 9: ... 610 705 800 895 970 1085 Fig Nr 4 Bedding dimensions The boiler placing with respect to the necessary handling space basic surroundings of AA5 AB5 according to ČSN 33 2000 1 ed 2 handling space of minimum 1000 mm in front of the boiler must be maintained a minimum distance of 400 mm between the back part of the boiler and the wall to maintain space for access to the back part of the boiler of min...

Page 10: ... 1 pc boiler jacket 1 pc thermomanometer 1 pc filling and draining cock Js 1 2 1 pc plug Js 6 4 blind 1 pc stifling screw 1 pc washer 10 5 16 pcs nut M10 16 pcs screw into metal ST 4 8 x 13 4 pcs 3 5 sect 6 pcs 6 10 sect flange of heat water DN 50 1 pc flange of returnable water DN 50 with a socket Js 1 2 for filling and draining cock 1 pc well of thermostat G 1 2 1 pc sealing φ 90 x 60 x 3 2 pcs ...

Page 11: ... Position the boiler body on the supporting brickwork bedding 2 Insert sealing 90 x 60 x 3 on the upper flange of the rear boiler section and mount the flange of heating water Pre weld the flange to the heating water distribution system 3 Insert sealing 90 x 60 x 3 on the lower flange of the rear boiler section and mount the flange of return water with a sleeve piece for water inlet valve and outl...

Page 12: ...the anchor bolts and attach them by using washers and nuts 4 Insert the thermo manometer into the upper part of the jacket 5 Put the upper part of the jacket on the side parts of the jacket and screw on by using the screws ST 4 8 x 13 1 Boiler drum insulation 2 Left side part of the jacket 3 Washer 10 5 4 pc 4 Nut M10 4 pc 5 Right side part of the jacket 6 Washer 10 5 4 pc 7 Nut M10 4 pc 8 Upper p...

Page 13: ...ver be impregnated or taken out for use except for cases necessarily needed such as repairs etc By draining the water and filling with new one the risk of rust and scale creation is increased If it is needed to fill water into the heat system we fill it only to a cooled down boiler to prevent section cracking After filling of the boiler and heat system checking of tightness of all joints is needed...

Page 14: ...ore fuel to be put up to the bottom part of the stoker hole the fuel to be stacked to a uniform layout along its entire boiler depth 10 As soon as the fuel grades to a dark red flame the air rose of the secondary air input on the stoker hole to be opened with an instrument 11 After flames become yellow the air rose of the secondary air input to be closed Provoz 1 After reaching the heat water temp...

Page 15: ...oiler at a temperature of 60 C or higher 12 After finishing of the heating period it is necessary to properly clean the boiler smoke stack and chimney pot The fulcrum pin smoky flap mechanism and other movable parts to be covered with graphite grease And the boiler room to be kept clean and dry 13 In case the heating system is not daily used in winter season then the water from boiler must be drai...

Page 16: ...boiler installation to an assembly company putting into operation and defect removing only to a professional contractual service accredited by the boiler producer VIADRUS a s otherwise the warranty for proper boiler operation is not valid If the boiler is operated according to the instructions mentioned in the Instructions for the boiler operation and installation the boiler does not require any s...

Page 17: ...kaging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure that calorific gain is achievable for the functional packaging unit EN 13431 YES Iron NO 3 3 Recovery by composting ensure compost ability in all terms of the standard for the functional packaging unit ...

Page 18: ...18 ...

Page 19: ...the boiler operation and installation is performed by a contractual service organization Completeness including the standard accessories and power adjustment according to the Instructions for operation and installation is granted by the producer by a contractual service organization The Warranty card is without filling up invalid Measured values Numerical value Chimney draught mbar Product of cons...

Page 20: ... card for customer user Recording of performed warranty and after warranty repairs and performance of regular product check Recording date Performed operation Contractual service organization signature stamp Customer s signature ...

Page 21: ...iler operation and installation is performed by a contractual service organization Completeness including the standard accessories and power adjustment according to the Instructions for operation and installation is granted by the producer by a contractual service organization The Warranty card is without filling up invalid Measured values Numerical value Chimney draught mbar Product of consumptio...

Page 22: ...22 ...

Page 23: ...er operation and installation is performed by a contractual service organization Completeness including the standard accessories and power adjustment according to the Instructions for operation and installation is granted by the producer by a contractual service organization The Warranty card is without filling up invalid Measured values Numerical value Chimney draught mbar Product of consumption ...

Page 24: ...24 Update 17 2013 GB ...

Reviews: