TR 252 

OPERATING INSTRUCTIONS 
Translation of the original instructions 

 
 

 

 

 

Summary of Contents for NORTON clipper TR 252

Page 1: ...TR 252 OPERATING INSTRUCTIONS Translation of the original instructions...

Page 2: ...VERS 2017 06 14 TR 252_MAN_EN 2...

Page 3: ...N TIC COMPATIBILITY 2014 30 UE NOISE 2000 14 CE and European standard EN 12418 Masonry and stone cutting off machines Safety Valid for machines as of serial number 1701xxxxxxx Storage site for the tec...

Page 4: ...VERS 2017 06 14 TR 252_MAN_EN 4...

Page 5: ...d fini 3 4 Assembly of the cooling system 14 3 5 Transport wheels 15 3 6 Longitudinal guide assembly 15 3 7 Side extension assembly 16 3 8 Installation of the handle for the cut in angle 16 3 9 Instal...

Page 6: ...and servicing requirements shall also be considered as included under use in accordance with the regulations 1 1 Symbols Important warnings and pieces of advice are indicated on the machine using sym...

Page 7: ...he use of other tools can damage the machine Read the blades specifications carefully to choose the correct tool for your application Attention is drawn to the use of BS2092 safety goggles in conformi...

Page 8: ...h performance for onsite wet cutting operations of a wide range of tiles As with all other NORTON CLIPPER products the operator will immediately appreciate the attention given to detail and quality of...

Page 9: ...disassembled to access the blade It offers maximum operator protection and increased visibility of the work piece The tightening of the fixing flange is done by a hexagonal head screw left hand thread...

Page 10: ...de 2950 min 1 Maximum clearance between table and blade guard at 0 80 mm Maximum clearance between table and blade guard at 45 60 mm Cutting length 1200 Flange diameter 70 Sound pressure level 71 dB A...

Page 11: ...may vary with site conditions in terms of Materials worked Wear Machine Lack of maintenance Inappropriate tool for application Tool in poor condition Unskilled operator Etc The exposure time to vibra...

Page 12: ...EN ISO 3744 Uncertainty K Sound power level LWeq NF EN ISO 3744 70184694289 79 dB A 2 5 dB A 71 dB A 4 dB A Values determined using the procedure described in the standard EN 12418 The measurements a...

Page 13: ...y 3 1 Assembly of the legs Lift up one side of the saw and unfold the legs without wheels Lift up the other side of the saw and unfold the legs with the wheels Encase the arm of blocking in the pin an...

Page 14: ...e the head of cut For that unscrew the knurled button which maintains the head on the right amount during transport 3 3 Assembly of the cooling system Fix the cable containing the water pipe along the...

Page 15: ...wheels to the bottom of the feet located on the side opposite of the handles using the screws butterflies 3 5 Longitudinal guide assembly Insert 2 threaded and pined shafts Rotate both shafts by 90 I...

Page 16: ...VERS 2017 06 14 TR 252_MAN_EN 16 3 6 Side extension assembly Insert both pined shafts Rotate both shafts by 90 to lock side extension 3 7 Installation of the handle for the cut in angle...

Page 17: ...cover of the blade guard using the crosshead screwdriver supplied with TR 252 and remove it Loosen the hexagonal nut left threaded on the blade shaft using the 18 mm wrench supplied with TR 252 which...

Page 18: ...edge of the water tray The pump will switch on together with motor Ensure that water is delivered adequately to the blade as insufficient water supply may result in premature failure of the diamond b...

Page 19: ...an Fold the legs WARNING this machine is not suited to be lifted with a crane Lock cutting head Tighten angular cutting guide Store the longitudinal cutting guide and the side extension o Dismount the...

Page 20: ...r hands away from the moving blade The long longitudinal cutting guide the side extension and fastening brackets can help you to achieve high accuracy cuts even with large materials Important advices...

Page 21: ...ange and blade fixing devices Clean Motor cooling fans Clean Water pan Clean Motor housing Clean Reachable nuts and screws Tighten up Water pump Clean Maintenance of the machine Always perform the mai...

Page 22: ...ection too small Change connection cable Defective connection cable Change connection cable Defective switch CAUTION can only be solved by qualified electrician Defective motor Change motor or contact...

Page 23: ...m appropriate to us but which is not always the quickest way Clear instructions will avoid problems and faulty deliveries If not sure please send us the defective part In the case of a warranty claim...

Page 24: ...RUSSIA TEL 74 955 408 355 FAX 74 959 373 224 SAINT GOBAIN ABRASIVES PTY LTD 2 MONTEER ROAD ISANDO 1600 P O BOX 67 SOUTH AFRICA TEL 27 11 961 2000 FAX 27 11 961 2184 5 SAINT GOBAIN ABRASIVOS S A CTRA...