background image

MINI 4 

p. 1 

MARCH 2011 

                            

 

 
 

INSTRUCTIONS AND MAINTENANCE 

 

MOD.MINI 4 

 

Read these directions carefully before operating. 
Don’t use the machine differently from the following description. 

 
 

1.

 

SPECIFICATIONS 

MODEL: 

MINI 4 

POWER SUPPLY: 

230 V 

TOTAL INSTALLED POWER: 

W 2300 

IRON POWER: 

W 800 

BOILER POWER: 

W 1500 

BOILER CAPACITY: 

L. 2,7  ( INOX) 

IRONING ENDURANCE: 

about 3/4 hours 

OPERATING STEAM PRESSURE:  

2,7-2,8 BAR

 

MAXIMUM PRESSURE: 

5 BAR 

WEIGHT: 

KG. 15 

OVERALL DIMENSIONS: 

cm 25x29x89 h. 

MADE IN ITALY 

 

2.

 

IMPORTANT 

Before  installing  MINI  4,  it  is  necessary  to  set  up 
the following facilities: 
-

 

electrical  plug  protected  and  suitable  to  MINI  4 
power  (it  is  better  to  use  an  earth  protector 
thermo magnetic switch 16 A ld 30mA). 

 
 

3.

 

OPENING OF PACKAGE 

 

1.

 

Open  the  box  containing  MINI  4,  take  the 
manual of instructions and read it carefully.

 

2.

 

Remove  MINI  4  from  the  box,  insert  the  cable 
support deep into the special hole (fig. 1) placed 
on the back side of the generator.

 

3.

 

Fix  the  spring  to  the  support  hook,  place  the 
iron  rest  on  the  table  and  put  the  iron  over  it 
(fig. 1). 

 
 

4.

 

CONNECTION AND STARTING 

 

With MINI 4 switched off and disconnected plug: 

 

1.

 

Unscrew  the  security  valve  plug  (fig.  1),  fill  the  boiler  with  water  till MAX  level  (fig.  2-4). 

Take the plug by the plastic part and screw it again: do not tighten too much or its gasket 
might get spoilt. 

N.B.

 make sure the exhaust tap of the boiler is closed. 

2.

 

Insert the plug into a 220 V 16 A socket. 

IRON

STEAM
TUBE

CABLE
SUPPORT

HOOK

SPRING

IRON REST

ELECTRIC WIRE

STEAM
TUBE

 

Fig. 1 

Summary of Contents for MINI 4

Page 1: ...earth protector thermo magnetic switch 16 A ld 30mA 3 OPENING OF PACKAGE 1 Open the box containing MINI 4 take the manual of instructions and read it carefully 2 Remove MINI 4 from the box insert the cable support deep into the special hole fig 1 placed on the back side of the generator 3 Fix the spring to the support hook place the iron rest on the table and put the iron over it fig 1 4 CONNECTIO...

Page 2: ...oiler only when it is switched off and cold not under pressure taking care to open the exhaust tap slowly fig 7 For carrying out this operation wear gauntlets against possible burns 4 Never replace the security valve plug fig 3 with other types of plug N B the security valve plug is set on 4 5 BAR and it has the function of a security valve 5 Connect MINI 4 to suitable protected socket 6 Always ke...

Page 3: ... ready again Fig 5 Fig 6 8 BOILER DISCHARGE Carry out this operation when the machine is off and the plug disconnected Unscrew the valve plug fig 4 Open the front panel and empty the boiler by means of the special tap fig 7 Once all the water has come out remember to turn the tap off and to close the panel The tap might get blocked up in this case take an iron wire with a diameter of 3 4 mm or sim...

Page 4: ...are considered dangerous for the operator 1 touching iron base when working 2 touching the solenoid valve when the machine is under pressure 3 emptying the boiler under pressure or touching the exhaust tap 4 touching the valve plug when MINI 4 is under pressure Do not iron garments directly on persons Do not leave hot iron on garments After use always put iron on its iron rest 15 PACKING STORAGE A...

Page 5: ...without any limitation consequential damages due to loss or no profit cutback or any other economical loss deriving form the use of a ROTONDI machine even in case the Company had been previously informed of such kind of possibility Should you need further information about this manual please contact ROTONDI GROUP S r l or the person who sold you the machine ...

Reviews: