background image

P E T  F O U N T A I N

I N S TA L L AT I O N / M A I N T E N A N C E  I N S T R U C T I O N S

INSTALLATION INSTRUCTIONS FOR M-PM54 PET FOUNTAIN

Important:  Read  all  instructions  and  refer  to  local 
codes prior to installation.

l

  It  is  recommended  to  include  a  supply  stop 
appropriate located on the supply line.

l

  An  in-line  PRV  installed  on  the  supply  line  is 
recommended  to  ensure  a  working  water  pressure 
of 40 - 60 psi.

l

 Supply line must be flushed of all foreign materials 
such as pipe dope, chips, etc.

l

  Piping  and  valve  must  be  drained  prior  to  being 
subjected to freezing temperatures.

Prepare  trench  for  water  supply.  At  fountain  location 
prepare  hole  to  trench  depth  and  large  enough  for  a 
person  to  work  in.  Lay  supply  line  into  trench  and 
above ground allowing extra line to be trimmed during 
hook up, refer to detail for roughs.

Refill trench and hole, compacting back fill as required. 
Leave  sufficient  depth  in  hole  to  accommodate 
concrete pour, 4” minimum recommended.

Prepare slab area surrounding fountain spreading and 
compacting  gravel  as  necessary.  Prepare  form 
approximately 6” diameter to protect supply stub outs. 
Protect  exposed  valve  assembly,  tubing  and  tube 
openings  to  prevent  damage  to  equipment  or  to 
prevent  tubes  from  becoming  filled  with  soil  or  debris. 
Then pour concrete, ensure concrete is flat and level.

Once  concrete  has  cured,  drill  3/4”  diameter  by  2” 
deep holes following the pattern shown in the mounting 
base detail for the provided drop-in anchors. Using the 
anchor  setting  tool,  hammer  the  provided  drop-in 
anchors into the drilled holes. Align mounting points on 
the  fountain  to  the  mounting  anchors  in  the  concrete 
and  secure  fixture  to  the  slab  using  the  provided 
mounting hardware.

Through  access  panel  make  up  connection  to  the 
fountain’s 3/4” NPTM supply inlet.

To  ensure  plumb  installation,  lay  a  bubble  level  on 
fountain  pedestal  and  adjust  using  shims  or  washers 
until  the  unit  is  level.  To  test  operation  of  hose  bibb, 
depress  activation  pushbutton  and  adjust  flow  rate  as 
required and check all connections for leaks.

4" REC

MIN

8"

REF

1/2" NPT ANCHORING
HARDWARE, PROVIDED

4

15
16

"

TYP

SUPPLY

INLET

SUPPLY INLET

CONNECTION FOR

3/4" NPTM, BY OTHERS

MOUNTING BASE DETAIL

* HOSE BIBB NOT

SHOWN FOR CLARITY

9

7
8

"

Please visit

 www.murdockmfg.com

 

for most current specifications.

 

M-PM54

Page 1 of 2

Revised: 

04/26/17

7109-606-001

MURDOCK  MFG.  • 

15125  Proctor  Avenue  •  City  of  Industry,  CA  91746  USA 

Phone  800-453-7465  or  626-333-2543  •  Fax  626-855-4860  •  www.murdockmfg.com

Member of

Reviews: