background image

9/19/02 

Page 1 of 5 

M036.2 

INSTALLATION OF PEPSI HIGH SECURITY VALIDATOR GUARD 

M036.2 

 
 
Parts Required: 

1 - 801,306,00x.x1 

Assembly Guard Bill Validator (Conlux) 

 

 

 

     

 

1 - 801,305,88x.x1 

Assembly Guard Bill Validator (Coinco) 

or 

 

 

 

1 – 801,305,89x.x1 

Assembly Guard Bill Validator (Mars) 

or 

 

 

 

1 – 801,305,90x.x1 

Assembly Guard Bill Validator Opening 

and 

 

 

 

4 - 800,303,19x.x1 

Bolt, Carriage1/4 - 20 x 5/8 Grade 5 

 

 

 

6 - 900,800,67x.x1 

Nut, Keps 1/4 - 20 

 

Tools Required: 

7/16" socket   

Ratchet for socket 

 

 

 

Drill 

 

 

5/16" drill bit 

 

 

 

Tape   

 

Phillips screwdriver 

 

 

 

Center punch   

Hammer 

 
NOTE:   PLEASE READ ALL INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING WORK. 
 
Instructions: 

 
Note:  

Prior to installing the validator guard, ensure that the wide vandal panel has been installed on 
the door. 

 
1. 

Unplug the vender. 

2. 

Cut out the appropriate template, the opening for the validator (if required), the four squares for 
the carriage bolts, and the two round holes for the studs. 

3. 

Using the four carriage bolts and tape, secure the template in place and mark the location for 
the two studs. 

4. 

Drill two 5/16" holes in the places marked in step 2. Use caution when drilling to ensure that no 
wires are damaged. 

5. 

Install the validator guard and secure with carriage bolts and nuts. It may be necessary to 
temporarily remove the Coinco BA30B control board to gain access to the upper stud. 

Reviews: