background image

 

  

 

 

 

 

 

 

 

 Pro-Ox 5900-BT-AIR Installation & Maintenance Guide

 

 

Thank you for purchasing a Clean Water System!  With proper installation and a 

little routine maintenance your system will be providing iron free water for many 

years. 

 

Please review this start-up guide entirely before beginning to install your system 

and follow the steps outlined for best results. 

 

The Pro-OX 5900-BT-AIR Iron Filter media must be activated with a 1 cup of un-

scented liquid chlorine bleach when first installing it

.  Read instructions for more 

information.  It is easy to do, but a critical step.   

 

The Pro-OX media produces very small particles (fines) when the system is first 

installed. Bring the water pressure up VERY slowly during the initial backwash by 

opening inlet valve slowly to avoid pushing the media up into the control head.  

 

Performing multiple backwashes at start-up is an important step. It is also 

recommended that the air draw or chemical draw functions be disabled during the 

start-up period to ensure all the smaller particles have been flushed out.  

 

You should also not bring any other systems online (i.e. softeners, filters, etc.) until 

the Pro-Ox system is fully flushed. Depending on the water quality, this may take 

several backwashes and a week or two of normal water use.   

 

The Pro-OX media contains dust. Use paper mask and ventilate area to avoid 

breathing dust when first pouring the media into the tank.    

 

Minimum 30 PSI required.  Maximum pressure 90 PSI. 

For indoor installation. Protect from sunlight, rain, and freezing. 

 

Watch These How-to Videos:   

https://youtu.be/05mJy573Y6E

 

 

For assistance call: 1-831-462-8500 M-F 8AM to 4PM PST 
Email us: 

[email protected]

 

More information online: 

www.cleanwaterstore.com

 

Clean Water Made Easy

 

www.cleanwaterstore.com 

 

Summary of Contents for Pro-Ox 5900-BT-AIR 1054

Page 1: ...media up into the control head Performing multiple backwashes at start up is an important step It is also recommended that the air draw or chemical draw functions be disabled during the start up peri...

Page 2: ...s to Starting Up Your Pro OX 5900 BT AIR System 14 Using the Optional Chlorine Side Tank System 16 Installing and Using the Optional Blue Tooth Legacy View App 17 How to Start A Manual Backwash 21 Pro...

Page 3: ...ass assembly with 1 pipe connectors 10 x 54 standard filter tank with distributor tube and bottom basket Plastic media funnel for adding Pro OX media 110 lbs of Pro OX media 16 lbs of Turbidex media 1...

Page 4: ...hen removes the iron from the water The backwash rinse cycle usually done at night every 2 4 days will remove accumulated iron and replenish the filter media bed Each night a fresh pocket of air is dr...

Page 5: ...el 1 5 or 2 0 CF 5 Plug in the power supply and program the valve 6 Follow the instructions to put the system online and to verify the system is leak free Pre Installation 1 Review your packing list t...

Page 6: ...optional A hose bib which is a faucet that you can attach a garden hose to is strongly recommended after the Pro OX Air Filter and before the second ball valve for rinsing and sampling water 8 If you...

Page 7: ...Pro Ox 5900 BT AIR Installation Startup Guide Page 7 www cleanwaterstore com Rev 02 26 2020 Fig 2 Diagram of a Typical Installation...

Page 8: ...the contiguous conductive nature of the plumbing system must be installed prior to your systems use This is simple and easy step to take if you are installing your water treatment system into copper...

Page 9: ...silicone grease to both O rings only O rings not tank thread on bottom of control valve and screw on 5900 BT control valve carefully 12 Do not lubricate tank threads or any other fittings other than O...

Page 10: ...ontrol valve connection P This is the connection on the outside of the valve nearest the side or outer section of the valve Plug into a wall outlet B and S connections are used to power optional exter...

Page 11: ...before the second ball valve This makes it easy to rinse your new system on start up and gives you a place to test water before it enters your house plumbing 4 If you will be using copper piping do n...

Page 12: ...will flash 2 Set time of day by pressing the Set Change button First digit will begin to flash 3 While scrolling through numbers it increases value 4 To decrease the value you will have to go all the...

Page 13: ...generation Time It is identified by the letter r in the left digit Set the desired time of day that a regeneration may occur when required We recommend setting system to backwash at 2 AM or when water...

Page 14: ...ction Pressing the menu enter button again takes you back to the home service screen displaying the clock time and the number of days until backwash See Historical Data and Real Time Flow Rate Pressin...

Page 15: ...ow of water into the filter 10 After several minutes you should have the valve fully open and with no media coming out The water will be black turning to gray mostly clear water the water does not get...

Page 16: ...rogramming Page 14 and make sure J 2 or J 3 is active J 2 setting means that approximately 8 ounces 1 cup of chlorine solution will be drawn in Set to minimum J 2 for but could be set to J 3 to allow...

Page 17: ...you have more than one system 4 If the valve you want to connect to doesn t show up or there is a problem connecting press the Scan for Devices button or the Legacy View logo at any time to refresh t...

Page 18: ...changed except Air Draw do that directly on the control valve see Page 13 14 while blue fields are informational only If you are unsure about the function of the field click the Info icon for more in...

Page 19: ...terstore com Rev 02 26 2020 3 Set Regeneration Time Example For 2am just type 2 and press OK Legacy App Advanced Settings From the Advanced Settings all items in ORANGE with a set button can be change...

Page 20: ...atus and History all items in ORANGE can be reset Start a regeneration or backwash cycle Option 1 Click on Regenerate Unit Now If you would like to force the unit into the next cycle step Click Go to...

Page 21: ...d hold the Set Change button 2 After 7 seconds the days remaining display will read 1 3 With days remaining at 1 press and hold the Set Change button again 4 After 5 seconds the regeneration cycle wil...

Page 22: ...Advance the valve back to Service position again and again press and hold the Regen button we are putting the valve back to the Backwash position 6 Open the Inlet valve just enough so you can hear the...

Page 23: ...Pro Ox 5900 BT AIR Installation Startup Guide Page 23 www cleanwaterstore com Rev 02 26 2020 Troubleshooting Chart...

Page 24: ...lean replace Chem valve Backwash drain line flow is restricted Place drain line in a bucket to verify flow Check facility drain for blockage Chemical draw not working J setting is set to 0 Set J param...

Page 25: ...the letters Err followed by a flashing number 2 6 There are five 5 error codes that could indicate a possible problem with the control valve Error 2 Valve is searching for homing slot Allow valve to c...

Page 26: ...s typically occurs if the motor cable has come unplugged from the circuit board Check that the motor cable is plugged into the circuit board and attached to the motor If this is not the issue the moto...

Page 27: ...ow rate and be backwashed frequently enough to keep the Pro OX filter media clean 5 Mud ball formation If your water has high levels of sediment silts or clay getting into the filter over time these e...

Page 28: ...connect the meter signal wire from the circuit board C3 Remove lower back base screws and detach lower back base C4 Remove screw and washer at piston drive yoke Remove powerhead mounting screws The en...

Page 29: ...ecial end spacer must be reused D5 Lubricate new seals with silicone lubricant included in the seal and spacer kit Make sure the special end spacer is properly seated in the valve body Install new sea...

Page 30: ...and set aside 5 Siphon water out of the Pro OX filter by inserting a small flexible tube down the distributor tube and siphoning out the water 6 Lay down clean tarp outside or somewhere you can flush...

Page 31: ...Pro Ox 5900 BT AIR Installation Startup Guide Page 31 www cleanwaterstore com Rev 02 26 2020 Control Valve Powerhead Assembly Exploded View...

Page 32: ...Pro Ox 5900 BT AIR Installation Startup Guide Page 32 www cleanwaterstore com Rev 02 26 2020...

Page 33: ...Pro Ox 5900 BT AIR Installation Startup Guide Page 33 www cleanwaterstore com Rev 02 26 2020 Valve Body Assembly Exploded View...

Page 34: ...Pro Ox 5900 BT AIR Installation Startup Guide Page 34 www cleanwaterstore com Rev 02 26 2020...

Page 35: ...e of defects in materials and workmanship for a period or seven 7 years subject to the manufacturer s conditions and or the conditions shown below Fleck other brand control valves have 5 year warranty...

Reviews: