background image

Gearmotor for swing gates

ATS30DGS
ATS50DGS

ATS30DGR

INSTALLATION MANUAL

FA01338-EN

EN

English

Summary of Contents for ATS30DGS

Page 1: ...Gearmotor for swing gates ATS30DGS ATS50DGS ATS30DGR INSTALLATION MANUAL FA01338 EN EN English...

Page 2: ...1 2 3 1 2 3 4...

Page 3: ...c Make sure you have set up a suitable dual pole cut off device along the power supply that is compliant with the installation rules It should completely cut off the power supply according to category...

Page 4: ...egies Simply follow these brief disposal guidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Befo...

Page 5: ...ible telescopic gearmotor 24 V with encoder for swing gates with Max C up to 200 mm with leaf up to 5 m and 400 kg Grey RAL7024 801MP 0110 ATS30DGR Irreversible telescopic gearmotor 24 V with encoder...

Page 6: ...ressure level dB A 70 70 70 Protection rating IP 54 54 54 Insulation class I I I Reduction ratio i 28 28 28 Weight kg 7 5 8 7 5 Cable types and minimum thicknesses Cable length m up to 20 from 20 to 3...

Page 7: ...r fitting the operator and accessories varies depending on the area where it is installed It is up to the installer to find the most suitable solution The drawings refer to a gearmotor installed on th...

Page 8: ...af to 90 or 120 First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indicated in the table A C B 60 60 E F 5 ATS30DGS AT...

Page 9: ...thout notice Translation of the original instructions Fastening the brackets Secure the post bracket with plugs and screws The holes on the bracket fixing plate allow you to vary the opening angle of...

Page 10: ...anged at any time and without notice Translation of the original instructions Fastening the gearmotor Lubricate all moving parts on the operator A The self locking nut must be loosely tightened so as...

Page 11: ...CAL CONNECTIONS Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmot...

Page 12: ...roswitch 10 mm in either direction turn the rod 20 times Determining the opening end of travel points Release the gearmotor Open the gate manually Send an opening command At the same time turn the rod...

Page 13: ...blishing the bracket fastening points Close the gate manually First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indica...

Page 14: ...cal connections Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmot...

Page 15: ...d of travel points Release the gearmotor Open the gate manually Send an opening command At the same time turn the rod for determining the opening end of travel point ANTICLOCKWISE until the gearmotor...

Page 16: ...p 16 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions FINAL OPERATIONS 1 2...

Page 17: ...f the system is not used for long periods of time e g for installations at sites with seasonal closures disconnect the power supply When the power supply is reconnected check the system is working cor...

Page 18: ...p 18 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Page 19: ...p 19 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Page 20: ...ME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions CAME S p A Via Martiri della Libert 15 31030 Dosson di Casier Treviso Italy...

Reviews: