background image

© Bredenoord 2017

Operation manual

|

www.bredenoord.com

B

re

d

e

n

o

o

rd

 b

v

 R

e

n

ta

l

P

o

s

tb

u

s

 2

0

1

2

2

 -

 7

3

0

2

 H

C

 A

p

e

ld

o

o

rn

 -

 Z

u

tp

h

e

n

s

e

s

tr

a

a

3

1

9

 -

  

7

3

2

5

 W

T

 A

p

e

ld

o

o

rn

T

e

l.

 +

3

1

(0

)5

5

 3

0

1

 8

5

 4

0

 -

 F

a

x

 +

3

1

(0

)5

5

 3

0

1

 8

5

 5

0

 -

 w

w

w

.b

re

d

e

n

o

o

rd

.c

o

m

 -

 r

e

n

ta

l@

b

re

d

e

n

o

o

rd

.c

o

m

Controller type:       Mitsubishi PLC

ESaver
R0944 - R0948
15

Summary of Contents for ESaver

Page 1: ...com B r e d e n o o r d b v R e n t a l Postbus 20122 7302 HC Apeldoorn Zutphensestraat 319 7325 WT Apeldoorn Tel 31 0 55 301 85 40 Fax 31 0 55 301 85 50 www bredenoord com rental bredenoord com Cont...

Page 2: ...stop 4 7 Installation of the ESaver 5 8 Connection of the ESaver 8 5 1 Electrical connections 8 5 2 Connecting power cables 6 9 Operating instructions 9 6 1 Starting and stopping 10 6 2 Main display...

Page 3: ...Volledige bedieningshandleiding 2 Bredenoord 2017 3 1 Volledige bedieningshandleiding ESaver R0944 R0948 15 kVA...

Page 4: ...and adequately trained personnel that is authorized by the customer No maintenance connection commissioning usage or other operation before consulting the manual Switch the ESaver safe before carrying...

Page 5: ...nds on the installation for this please contact the owner of the installation The ESaver is only permitted to be operated serviced maintained and connected by qualified and adequately trained personne...

Page 6: ...switched it should be done by qualified personnel 3 2 Emergency stop An emergency stop is mounted on the control panel or on the outside of the housing This switches off the machine during an emergenc...

Page 7: ...ainst buildings or walls Ensure there is enough free space to open the doors The ESaver must be placed on a flat strong and horizontal surface When placing the ESaver indoors the following instruction...

Page 8: ...and earth connection of the generator are directly earthed When no earthing is available this is done by placing an earth pin The connection of the ESaver should be done by a certified installation c...

Page 9: ...witch does not exceed the maximum step load of the ESaver see technical data 6 1 Starting and stopping Starting Ensure that the diesel genset can automatically start by means of the connector 5 see op...

Page 10: ...itional information about the main display In the main display are several symbols displayed which can be selected by pressing These symbols are provide with By pressing the symbol a new display wil a...

Page 11: ...Volledige bedieningshandleiding 2 Bredenoord 2017 11 Display Genset Display Battery status Display Consumer...

Page 12: ...battery Important events Important events Only important event will be triggered and displayed Below is showed which events will be displayed Timers Cooling Duration of the time when the genset is ru...

Page 13: ...istory list Battery use of battery With pressing button B the next display will appear Press Week timer will open a new display 9 ESaver in operation 10 Generator running hours 11 Supplied energy 12 C...

Page 14: ...itch time hours press the hour indication 7 Adjust switch time minutes press the minute indication Normal functioning timer At the switch on point example 8 00 hour the diesel genset starts At the swi...

Page 15: ...f the timer are modified At the switch on point example 8 00 hour the diesel genset starts Then the diesel genset stops manually On the next switch on point the diesel genset starts again 6 5 Testing...

Page 16: ...rd 2017 16 One smiley will appear if the genset is connected correctly After this the charging will be checked Checking charging please wait When the genset works correctly a second smiley will appear...

Page 17: ...Volledige bedieningshandleiding 2 Bredenoord 2017 17 7 Construction Front Back 1 Selector switch 2 Touch screen 3 Battery monitor 4 Emergency stop 5 Inverters...

Page 18: ...nu is secured with a pin code Service button in the Test Menu is marked red After entering the correct pin code a arrow button will appear at the lower right corner of the display Service menu In the...

Page 19: ...ing software from ABB or PANASONIC Configurations 1 The values shown above can be set to a desired value by pressing the number which needs to be set or changed Configurations 2 The start stop conditi...

Page 20: ...Volledige bedieningshandleiding 2 Bredenoord 2017 20 A Status ESaver B Reset data C Adjusting the clock D Main menu settings E Display settings...

Page 21: ...the batteries disconnect or reduce the load or install higher capacity batteries Fit shorter and or thicker battery cables Low battery and ov erload LEDs f lash simultaneously Ripple voltage on the D...

Page 22: ...by an extremely high charging current with respect to battery capacity so that bulk time is insufficient Reduce the charging current or select the fixed charging characteristics The battery is ov erc...

Page 23: ...l data of this manual Moving by means of the lifting eye if applicable The ESaver can be lifted by means of the lifting eye with a chain and a suitable crane Never attach the chain directly to the lif...

Page 24: ...mains side During work always wear the required personal protective equipment and clothing The removal of environmentally harmful waste such as batteries should be done according to local laws and en...

Page 25: ...Test batteries with battery tester yearly o Test inverters o Wiring on fixation and damage o Power outlets on oxidation and burns o Housing on damage o Housing on isolation material o Locksmithing of...

Page 26: ...or accessories are added to the ESaver without written permission from the manufacturer The ESaver is used for other purposes than intended by the manufacturer The ESaver is not installed moved operat...

Page 27: ...948 Dimensions L W H 1200 x 800 x 2335 mm Weight net gross 1335 1335 kg Environment temperature 10 T 40 C Voltage and frequency 231 400V 50 Hz Apparent power 15 kVA Real power 12 kW Peak power 15 kVA...

Reviews: