background image

 

UV_Home_(anglais) - DOC012472 - Ind. O03 - 27/04/2017 
 

 
 
 
 
 

REACTOR IN THE HOME RANGE 

230V 

 
 
 
 
 

INSTALLATION AND MAINTENANCE MANUAL

 

 
 
 
 
 

 

 

 

 

 

Summary of Contents for HOME 2 -230V

Page 1: ...UV_Home_ anglais DOC012472 Ind O03 27 04 2017 REACTOR IN THE HOME RANGE 230V INSTALLATION AND MAINTENANCE MANUAL ...

Page 2: ...instructions carefully in order to optimize the operation of your reactor TABLE OF CONTENTS pages A Technical characteristics 3 B Safety Warnings 4 C Installation guide 5 1 Foreword 5 2 Usage environment 5 3 Instructions for reactor installation 5 4 Instructions for electrical connections 6 5 Filtration kit options 7 a Mounting of the 2 filters kit for HOME 2 and HOME 3 7 b Mounting of the 3 filte...

Page 3: ...d Independent wall mounted Material Anodized Aluminium Anodized Aluminium Anodized Aluminium Anodized Aluminium Anodized Aluminium Dimensions mm 280x120x70 280x120x70 280x120x70 280x120x70 280x120x70 Cable length between cabinet reactor m cm 75 75 75 75 75 Weight kg 0 84 0 84 0 9 0 9 0 9 Cabinet ventilation No No No No No Power supply V 220 240 220 240 220 240 220 240 220 240 Frequency Hz 50 50 50...

Page 4: ...missions quality Even when stopped power is present in the electrical unit so make sure that the main power supply upstream of the electrical cabinet is switched off before carrying out any work on the equipment Do not use the reactor if the power supply wire is worn or damaged In this case it should be replaced To avoid electric short circuits do not place the electric wires or the reactor in the...

Page 5: ...l the instructions in this manual before switching on the reactor 2 Usage environment Location Room protected from direct sunlight and bad weather Ambient temperature between 0 C et 40 C Corrosive environment Protect the electrical cabinet from any corrosive emanations hydrochloric acid vapors salt Ambient humidity 80 dry area 3 Instructions for reactor installation Ø The reactor can be installed ...

Page 6: ...pport easily Ø The reactor should be installed as closest as possible from the water supply after a booster after a softener The maximum pressure in the line must never be higher than the maximum operating pressure of the reactor see Technical characteristics page 3 Do not installed a by pass between the inlet and the outlet of the reactor 4 Instructions for electrical connections Ø The electrical...

Page 7: ...V reactor fixing screw 2 per reactor 2 3 2 VIS004503 Zinc flat washer Ø6 2 3 3 VIS004504 Zinc nut Th M6 2 4 ACC004439 Hose stainless steel 1 5 ACC004445 Nipple male male 4 6 RAC004444 Rotary coupling 1 7 JTS004442 Fibre seal 20x27 5 8 VIS004440 Filter fixing screw 4 per filter 8 9 1 9 2 FIL004326 Filter bowls 2 T DIV005922 Standard Teflon roll 1 INSTALLATION OF CARTRIDGES IN THE FILTER BOWLS CAR00...

Page 8: ...503 Zinc flat washer Ø6 2 3 3 VIS004504 Zinc nut Th M6 2 4 ACC004439 Hose stainless steel 1 5 ACC004445 Nipple male male 6 6 RAC004444 Rotary coupling 2 7 JTS004442 Fibre seal 20x27 7 8 VIS004440 Filter fixing screw 4 per filter 12 9 1 9 2 9 3 FIL004326 Filter bowls 3 T DIV005922 Standard Teflon roll 1 INSTALLATION OF CARTRIDGES IN THE FILTER BOWLS CAR004466 60µ cartridge washable to mount on filt...

Page 9: ...ws 8 Tip Before performing step 3 we advise you to mark the position of the filter support attachment on the wall 3 Install the UV HOME reactor on the filter support To do this disengage the UV reactor from the black PVC collars Then screw the 2 PVC collars on to the filter support with the screws 3 1 the washers 3 2 and the nuts 3 3 Finally clip the UV reactor on to the black PVC collars 4 Instal...

Page 10: ...he wall 3 Connect the electrical power supply to the Pro3 Monitor box 4 Calibrate the UV sensor Turn the UV lamp on The UV C lamps will increase in temperature to reach maximum radiation in two to five minutes depending on the temperature of the liquid to be processed Make water flows into the reactor by slightly opening a tap do not forget to turn it off when the sensor calibration is over It is ...

Page 11: ...m of the system in order to fill the piping with treated water 4 Switch on the On Off switch Check the lamp indicator is on 5 Check hour counter is running 6 At the first start up or when the lamp has been replaced by a new one proceed to the sensor calibration option 7 Fill maintenance file see F Maintenance page 14 The device must run without stop 24h 24h with hydraulic load except in the event ...

Page 12: ...om its support by making it slide through the clips 5 Make sure that the UV lamp is cooled enough before handle it 6 Remove the lamp use the connector if necessary and lay it on a clean and smooth surface Carry out this operation carefully without touching the glass of the lamp with the hands Do not let the lamp fall into the quartz sleeve it could break off into the quartz sleeve and damage the q...

Page 13: ...ter and soap on the seal Position it around the quartz sleeve Fully push it into its location with the nail do not use tools 13 Replace the flat washer Screw back normally the stainless steel nut with hand 14 Put the installation back in pressure before the reassembly of the lamp and check that there is no leakage in the quartz sleeve 15 Take hold of the new lamp taking care not to place your fing...

Page 14: ...d O03 27 04 2017 Copyright BIO UV Marque Modèles et Brevets déposés Produits exclusifs Page 14 F MAINTENANCE FILE CAUTION This sheet must be kept up to date It provides a record of the reactor s operating cycle Date Action done by ...

Page 15: ...37 5x20 1A ELE001837 5x20 1A ELE001837 5x20 1A ELE001837 5x20 1A 2 ON OFF switch ELE000770 ELE000770 ELE000770 ELE000770 ELE000770 3 Lamp indicator ELE000817 ELE000817 ELE000817 ELE000817 ELE000817 4 Ballast BAL007134 BAL005604 BAL005604 BAL005604 BAL006995 5 Hour counter ELE000026 ELE000026 ELE000026 ELE000026 ELE000026 Fuse replacement If the lamp indicator is off and the counter is not running ...

Page 16: ...e outside in order to retrieve and send the signal NO normally open contact connection between terminals 3 and 4 This contact is open in alarm or in the event of a power failure and closed when OK NC normally closed contact connection between terminals 4 and 5 This contact is closed in alarm or in the event of a power failure and open when OK Example of wiring for a NC electrovalve Normally closed...

Page 17: ... ELE002603 3 Lamp LPE000003 LPE000004 LPE000005 LPE000005 LPE000006 4 Sealing nut USI004134 USI004134 USI005244 USI005244 USI005244 5 Protection washer PIE000659 PIE000659 PIE000659 PIE000659 PIE000659 6 Quartz sleeve d25 QUA000016 QUA000017 QUA000018 QUA000018 QUA000019 7 O ring d25 JTS000100 JTS000100 JTS000100 JTS000100 JTS000100 8 Teflon UV sensor Option ELE004721 ELE004721 ELE004721 ELE004721...

Page 18: ...4 Male threaded 3 4 5 UV HOME 4 1067 159 871 1067 136 77 120 284 Male threaded 1 4 8 UV HOME 6 1072 154 865 1072 160 77 120 284 Male threaded 1 1 2 6 8 UV HOME 9 1325 155 1119 1325 158 77 120 284 Male threaded 1 1 2 8 3 KIT UV HOME 2 2 FILTERS 77 120 284 152 527 532 Male threaded 3 4 8 KIT UV HOME 2 3 FILTERS 77 120 284 152 527 708 Male threaded 3 4 8 5 KIT UV HOME 3 2 FILTERS 77 120 284 152 527 7...

Page 19: ...add of components within the electrical cabinet Use of parts that don t come from BIO UV No respect of the installation recommendations A reactor that has run without water No respect of the use and maintenance recommendations Caution the quartz tube and the lamp are not guaranteed against breakage Faulty parts must be returned to BIO UV with details of the unit type and serial number for exchange...

Reviews: