background image

Ruby 0-4-0T Kit

Assembly Instructions

Summary of Contents for Ruby 0-4-0T Kit

Page 1: ...Ruby 0 4 0T Kit Assembly Instructions...

Page 2: ...35 Spacer 2 36 Main Rod Assembly 2 37 Large E clip 4 38 M2 Nut 6 39 Reversing Quadrant Assembly 1 40 M2 x 4 Screw 2 41 Valve Rod 2 42 Small E clip 4 PART NO NAME QTY 43 Cylinder 2 44 Reversing Rod 1...

Page 3: ...carefully and you should have no trouble Refer to your parts list and check that you received all the parts necessary to assemble the engine Each part or group of parts is packed in its own plastic b...

Page 4: ...s 72 The assembly should look like photo 4 1 4 Screw the assembly to the frames with four M2 x 8 screws 15 You may have to loosen the rear boiler saddle pieces so that the notches in them fit over the...

Page 5: ...back it off a half turn or so See photo 6 You may optionally add an M2 nut 38 to hold the rod in the quadrant lever 3 6 Screw the reversing quadrant 39 to the deck plate with two M2 x 4 screws 3 as p...

Page 6: ...If the tiny groove trav els inside the valve block screw the valve farther onto the valve rod This can be done with the valve in place no need to disassemble anything If the groove never reaches the...

Page 7: ...sure gauge later Set the boiler aside 3 11 Put the saddle blocks 50 in position above the valve block assembly and screw them in place with four M2 x 3 screws 72 as shown in the draw ing A B C D show...

Page 8: ...to the deck with one cap nut 29 Slide the jet 26 into the back of the burner Carefully and gently bend the copper gas line until the threaded part of the gas valve lines up well with the end of the ga...

Page 9: ...7...

Page 10: ...8...

Page 11: ...9...

Page 12: ...33268 Central Ave Union City CA 94587 USA TEL 1 510 324 3399 FAX 1 510 324 3366 www accucraft com www accucraftestore com COPYRIGHT 2017 ACCUCRAFT COMPANY ALL RIGHTS RESERVED...

Reviews: