19
www.zwilling.com
GB
Operation
Operation
1
Putting the kettle into operation
Prior to first use, you must unwind the connection cable completely and guide it through the
opening on the base.
2.
1.
2
Filling the water
To fill with water, lift the water container from the base using the handle and press the button to
open the lid. There is a measuring scale for cups and litres on the inside. After filling, close the lid
in such a way that it audibly clicks into place.
MAX
1.0L
2.
1.
Observe the MAX
marking for the maximum
water volume. Do not
overfill.
Summary of Contents for 1002478
Page 13: ...13 www zwilling com...
Page 25: ...25 www zwilling com...
Page 37: ...37 www zwilling com...
Page 49: ...49 www zwilling com...
Page 61: ...61 www zwilling com...
Page 62: ...62...
Page 63: ...63 www zwilling com...