Z884
SHALLOW TRENCH DRAIN SYSTEM™
INSTALLATION INSTRUCTIONS
JOINT CONNECTION
Assembling the trench run is easy using Flo-Thru’s mechanical interlocking joints. Simply align the two mating ends of the
trench sections and fasten with the hardware fasteners provided. A silicone caulk, or a construction adhesive, such as Liquid
Nails, is recommended to be used at each joint as a sealer.