Z884

SHALLOW TRENCH DRAIN SYSTEM™
INSTALLATION INSTRUCTIONS

Upon completion of the trench excavation, the channels should be placed in order alongside the excavation and according to
the job layout.  Grates are not installed at this time.

OVERALL LAYOUT

Summary of Contents for Z884

Page 1: ...Zurn Industries Limited 3544 Nashua Drive Mississauga Ontario L4V 1L2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev B Date 5 9 2018 C N No 140014 Form No FT628 Page 1 of 9 Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATIONINSTRUCTIONS WARNING Cancer and Reproductive Harm www P65Warnings ca gov ADVERTENCIA Cáncer y daño reproductivo www P65Warnings ca gov AVERTISSEMENT Cancer et effets néfastes sur ...

Page 2: ...5 9 2018 C N No 140014 Form No FT628 Page 2 of 9 Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATIONINSTRUCTIONS ACCESSORIES Above are some of the trench drain components typical to an installation Double check your order to ensure that you have all components particular to your job before beginning your installation Contact Zurn Customer Service at 1 877 ZURN NOW should additional material be required ...

Page 3: ...rio L4V 1L2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev B Date 5 9 2018 C N No 140014 Form No FT628 Page 3 of 9 Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATIONINSTRUCTIONS EXCAVATION Trench excavation must be 4 102mm greater than the trench depth and a minimum width of 14 356mm Soft and or shifting soil substrates may cause cracking of the concrete and consequent movement of the trench It is c...

Page 4: ...Canada Zurn Industries Limited 3544 Nashua Drive Mississauga Ontario L4V 1L2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev B Date 5 9 2018 C N No 140014 Form No FT628 Page 4 of 9 Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATIONINSTRUCTIONS Upon completion of the trench excavation the channels should be placed in order alongside the excavation and according to the job layout Grates are not install...

Page 5: ... L4V 1L2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev B Date 5 9 2018 C N No 140014 Form No FT628 Page 5 of 9 Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATIONINSTRUCTIONS SUSPENDED INSTALLATION An alternative means of installation is to suspend the trench drain as shown Wooden braces to hang the trench run can be attached to the drain body through the grate lock down bars as illustrated above No...

Page 6: ...rio L4V 1L2 Ph 905 405 8272 Fax 905 405 1292 www zurn com Rev B Date 5 9 2018 C N No 140014 Form No FT628 Page 6 of 9 Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATIONINSTRUCTIONS JOINT CONNECTION Assembling the trench run is easy using Flo Thru s mechanical interlocking joints Simply align the two mating ends of the trench sections and fasten with the hardware fasteners provided A silicone caulk or a...

Page 7: ...ev B Date 5 9 2018 C N No 140014 Form No FT628 Page 7 of 9 Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATIONINSTRUCTIONS OUTLETS ACCESSORIES To attach an end outlet or end cap cut trench to desired length if necessary and attach with provided screws and a silicone caulk or a construction adhesive if desired A bottom outlet is attached to the bottom side of the trench drain with provided screws and a s...

Page 8: ...NINSTRUCTIONS POURING THE CONCRETE It is necessary to install a 4 1 4 108mm wide spacer supplied by others in the grate section of the trench to maintain the width during the concrete pour Pour the concrete around the three sides of the trench drain Be certain to adequately VIBRATE the concrete as it is being placed Proper vibration will eliminate any unwanted voids within the concrete pour Finish...

Page 9: ...ALLATIONINSTRUCTIONS AFTER THE POUR After the concrete has been poured vibrated and given sufficient time to dry both the grates and grate lock down bolts must be installed The center of the grate should straddle the toggle in lockdown bar The exception is when the channel is cut To place these grates line up the lock down hole in the grate with the lock down hole in the bar Grates with a length o...