FV606 Rev. A 8/6/2018
Page 10
Shroud Installation:
•
Remove the wall bracket and drill 3/4” holes into the
center of the holes previously marked. (Note: For installation
with carrier, do NOT drill the two outside holes. For retrofit
applications, the two outside holes are recommended.) En-
sure that wall studs are not immediately behind the marked
hole locations prior to drilling.
•
Install anchor toggle bolts into previously drilled holes in
walls.
•
Re-install wall bracket with coarse screws in previous lo-
cation. Then, fasten the wall bracket with 3/8” bolts through
each holes and into the toggle bolts.
•
Place shroud on hanger hooks of wall bracket as shown.
Then, position the pivot of the shroud through the hole in the
wall bracket. (Note: the shroud will likely need to be rotated
upward slightly in order to install each pivot.
•
After one pivot is installed, fasten the flange screw into
the pivot with the 3mm allen wrench. Then repeat this step
for the other side
•
Rotate the shroud up to the basin until the threaded
hole in the L-bracket in visible through the slot in the shroud.
Then, install the screw shown, and repeat for the other side.
19
13
Step 2
Step 3
Step 5
Step 4
20
16