Mounting and installation
nBox, Installation instructions 1.0 | 02.2021 | en
28
Connecting phase monitors: connection diagram
Connecting phase monitors: three-phase operation
Requirement:
— The general voltage supply is interrupted.
1. If the address is already known, set the desired address using the rotary selector switch on the device.
2. Connect the system bus to terminals
B1
and
B2
.
3. Connect the phases to be monitored to terminals
L1
,
L2
,
L3
and
N
.
Connecting phase monitors: single-phase operation
Requirement:
— The general voltage supply is interrupted.
1. If the address is already known, set the desired address using the rotary selector switch on the device.
2. Connect the system bus to terminals
B1
and
B2
.
3. Connect the phase to be monitored to terminal
L1
and
N
.
4. Bridge terminals
L2
and
L3
to terminal
L1
.
Summary of Contents for 22171150
Page 1: ...NBOX M O N T A G E A N L E I T U N G ...
Page 48: ...zumtobel com contact DE 11 2020 Zumtobel Lighting GmbH D A S L I C H T ...
Page 49: ...NBOX I N S T A L L A T I O N I N S T R U C T I O N S ...
Page 96: ...zumtobel com contact EN 11 2020 Zumtobel Lighting GmbH T H E L I G H T ...
Page 97: ...NBOX M A N U A L D E I N S T R U C C I O N E S D E M O N T A J E ...
Page 143: ...zumtobel com contact ES 11 2020 Zumtobel Lighting GmbH T H E L I G H T ...
Page 144: ...NBOX M A N U E L D E M O N T A G E ...
Page 190: ...zumtobel com contact FR 02 2020 Zumtobel Lighting GmbH L A L U M I È R E ...
Page 191: ...NBOX I S T R U Z I O N I P E R I L M O N T A G G I O ...
Page 237: ...zumtobel com contact IT 11 2020 Zumtobel Lighting GmbH L A L U C E ...
Page 238: ...NBOX M O N T A G E H A N D L E I D I N G ...
Page 284: ...zumtobel com contact H E T L I C H T NL 11 2020 Zumtobel Lighting GmbH ...