Manual of 03/05/2021 Rev. 1.1 “User Manual EV CHARGER 3PH 22kW”
47/62
Figure 380 - Dimensions for installation
If the ZVM-GATEWAY is installed outdoors, extra protection is required to protect it from the weather.
9.4.4.
Internet connection
To connect the system to the internet, the Ethernet cable must be connected to the ETN port on the device;
the network cable connected to Charger no. 1 must be connected to the CAN port.
Once the connections have been made, make sure the connection is active and running.
If the LED of the internal connection is not on, check that the network cables are connected to the correct
ports and that the cables are crimped.
9.5.
Commissioning
Before commissioning the device, check that the cables are connected properly.
1.
Switch on the chargers and check the status of the LEDs, and those on the ZVM-GATEWAY. If they are
not on, use a multimeter to check whether there is a problem with the cables or power supply.