ZTE WP560/960
User Manual
1. Remove the battery cover 2. Install UIM card (pay attention to
UIM card’s cut corner position)
3. Follow the arrow to push the
UIM-card into the card holder
Installing Battery
The FWP is equipped with a rechargeable built-in battery which can supply
power to the FWP when the power adapter is not available. When the power
adapter is supplying power to the FWP, it is also charging the battery.
When you are installing built-in battery, make sure your FWP’s power
switch is in “OFF” state and the external power supply is disconnected.
14
Summary of Contents for WP560
Page 1: ......
Page 2: ......
Page 71: ......
Page 89: ...ZTE WP560 960 用户手册 3 电池安装后示意 4 装上电池盖 话机手柄安装 连接无线固话和电脑 无线固话挂墙安装 14 ...
Page 133: ......