ZTE WP560/960
User Manual
Please do not make calls on a lightening day if you have installed an outdoor
antenna.
Operation guide
1
)
Lightning rod
Please install the lightning rod near your outdoor antenna, the lightning rod
should be higher than your outdoor antenna, well grounded, and have a grounding
resistance less than 10ohm. Furthermore, the angle between the top of the rod and
the outmost point of the antenna shall not exceed 45 degree, and the horizontal
distance between the rod and the antenna shall not be shorter than 3 meters. See
below:
2
)
Lightening arrester
Please connect 2 meters of feeder cable to the antenna port on your FWP
before installing the lightning arrester. Connect the arrester to the outdoor antenna
through a 15-meter long feeder cable. In the middle of the lightening arrester is a
ground point, which is to be connected to a grounding line chosen according to
11
Summary of Contents for WP560
Page 1: ......
Page 2: ......
Page 71: ......
Page 89: ...ZTE WP560 960 用户手册 3 电池安装后示意 4 装上电池盖 话机手柄安装 连接无线固话和电脑 无线固话挂墙安装 14 ...
Page 133: ......