2-CYLINDER HEAD ASSEMBLY
5
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1251112-002093 M6×30 Hexagon flange bolts (color zinc)
3
12±1.5N.m
2
1251401-001000 φ8×14 hollow positioning pin
2
3
1051656-002000 ZT158MJ water pump sealant
1
4
1051468-011000 18.2×2.4 EPDM O-ring
1
5
1051956-002000 ZT158MJ water pump leaking pipe
1
PROCEDURE:
●
Use 8#T rod sleeve to remove the three bolts
⑴
, remove the water pump, positioning pin
⑵
, sealant
⑶
and
O-ring
⑷
.
●
Leaking pipe
⑸
can be removed by turning counterclockwise.
●
Clean up the remaining sealant on the bonding surface.
CAUTION:
●
There is still a part of antifreeze in the water pump. When disassembling, place a rag under the water pump to
prevent the antifreeze from directly contaminating the surface of the engine.
●
When cleaning the remaining sealant, be careful not to allow foreign matter to enter the engine.
●
The matching relationship between the position shown in the water pump shaft
②
and the camshaft mounting
bolt
①
is shown in the figure. The camshaft also serves as the driving tooth of the water pump.
Fig.1 CYLINDER HEAD
ASSEMBLY
Water pump assembly-1