background image

5.5 ELECTRICAL CONNECTION OF THE EQUIPMENT

·

 

The installation must be carried out by qualified personnel.

·

 

 Cables complying to the section with the current directives must be installed 

preventing heating and a voltage drop higher than that allowed. The current 

regulations must be complied with and, at all times, the designer's criteria must be 

followed.

·

 

Before connecting the cables, check that the electrical installation is disconnected 

and that there is no voltage between the cables.

·

 

Once installed, the device must comply with the following directives:

- Low Voltage Directive 2006/95/CE

- Machinery Directive 2006/42/CE

- Electromagnetic Compatibility Directive 2004/108/CE

·

 

Once these operations have been carried out, it is necessary to verify the tightening 

of all the electrical connections (a badly tightened cable can cause irreparable 

damage).

·

 

Check that the earthing has been carried out and that the thermal and over-current 

protections have been regulated according to the values established on the rating 

plate.

·

 

As a safety measure, if the fan runs out of voltage, it must be made so that all 

other electrical elements are without voltage.

5.4.1.  CONNECTING WITH ZONAIR3D CONTROLLER

· 

Strip the power cable and connect it to 230v (50 / 60Hz)

 

general. It is 

recommended electrical protection type and connected to the control panel fire 

alarm.

· 

Make sure that the probe connection cables are correctly switched (5 and 6) and 

(17 and 18) in their respective strips that come from.

· 

Pressure switch connection:

     · 

Open the transparent cover of the differential pressure switch (2 star screws)

     · 

Set the pressure switch according to the indications p. 12.

· 

Remove the connecting strip from the pressure switch cable terminals; and connect

passing the cables to terminals 1 and 2 through the M16 gland of the pressure switch

inside the pressure switch, taking care that they do not touch and that replace the 

transparent lid well.

· 

Screw the transparent cover back on.

· 

Fix the pressure switch in the position indicated by means of the self-tapping 

screws provided, on the side of the machine are the fixing holes.

· 

Cut to size and connect the transparent tube (from the + socket to the

pressure ; and from the socket - to the pressure switch input -), firmly (in

the pressure switch must reach the second thickness).

Summary of Contents for PURE AIR RESIDENTIAL 100

Page 1: ...INSTALLATION MANUAL PURE AIR RESIDENTIAL RESIDENTIAL ...

Page 2: ......

Page 3: ...cerns over the constant and ever increasing deterioration of the quality of the air we breathe Pure Air Residential is an air purification equipment specially designed for indoor spaces Its unique system filters and purifies polluted air transforming it into the best quality air free from contaminating particulate free from environmental ozone and with toxic irritating and carcinogenic gaseous pol...

Page 4: ......

Page 5: ...NECTION OF THE EQUIPMENT _________________________ 5 4 1 CONNECTING WITH ZONAIR3D CONTROLLER 5 4 2 CONNECTING WITHOUT ZONAIR3D CONTROLLER 5 5 CONNECTING THE UNIT TO THE THE DUCT SYSTEM ___________________ 6 START UP PROCEDURE _____________________________________________________ 7 EMERGENCY OPERATIONS _________________________________________________ 8 PREVENTIVE MAINTENANCE ______________________...

Page 6: ...is in no responsible for any damage or injury caused to persons or objects resulting from failure to comply with safety standards and any possible modifications to the product The EC seal and statement of conformity serve as a proof of the product s compliance with applicable European Community standards ZONAIR3D engineers are firmly comitted to research and development to achieve products with im...

Page 7: ...or the shipment is not complete write down the problems on the delivery slip and send a claim to the carrier Also report any problems to Eurofred Zonair3D Components should be transported using appropiate hoist and slings The equipment has corner lugs for loading and unloading ICON LABEL MEANING 7 Pure Air Residential Caution the panel may fall once opened Caution cut off the power supply before r...

Page 8: ... the electric current in the isolator in order to prevent possible accidents with the moving parts of the equipment which might start running unpredictably as well as to prevent direct or indirect contact with any active part of the equipment During the installation the equipment must be leveled for a good adjustment of the different units and a good opening of the registers To check the perfect c...

Page 9: ...d on the nameplate the minimum allowed voltage will be 10 less than the nominal voltage indicated on the nameplate It will be verified that the earth connection is well connected Once all the checks have been made remove the stop position of the equipment turn it ON The fan will not start if the ductwork is not completely closed as the connection of the fan without load can cause overcurrents that...

Page 10: ...main components of the main module W L PREFILTER GRSYSTEM SECTION FAN SECTION ABSOLUTE FILTER SECTION Air flow Air flow Air flow Air flow H Air flow Maintenance PRODUCT RANGE FLOW m3 h DIMENSIONS H x L x W mm FAN POWER W A WEIGHT kg PAR 100 160 120 207 2 x 583 2 x 985 27W 0 27 A 1 fan 48 PAR 300 350 250 237 2 x 583 2 x 985 54W 0 54 A 2 fans 48 5 VOLTAGE V FREQ Hz 230 50 60 230 50 60 Air flow ...

Page 11: ...ip 17 and 18 attached to strip 3 230v network cable 2 phases earth 4 ON OFF main switch 5 PCB registration cover 4 M5 screws 6 Positive pressure taking of the H14 7 Differential pressure switch 8 Connection to positive pressure switch H14 9 M5 threads for fixing the anchor brackets 10 Taking the H14 negative pressure 11 Connection to negative pressure switch H14 12 Red LED indicative of HEPA14 fil...

Page 12: ...the unit is installed in a 100Pa duct system the pressure switch should be set to about 135Pa and the machine would give at least 180m3 h initial about 260m3 h and pressure difference in H14 of initial 95Pa Switch delta 40Pa 5 2 SETTING UP LOCATION Avoid installing the device in areas close to heat sources and humid areas where the it may come into contact with water It is advisable to place the d...

Page 13: ...sversal OK vertical For ceiling and floor mounting the equipment must be suspended from the four existing brackets in each unit as follows ATTENTION Due to the length and weight of the devices each unit must be suspended separately No obstacle shall prevent or reduce the passage of air in suction ...

Page 14: ...the fan runs out of voltage it must be made so that all other electrical elements are without voltage 5 4 1 CONNECTING WITH ZONAIR3D CONTROLLER Strip the power cable and connect it to 230v 50 60Hz general It is recommended electrical protection type and connected to the control panel fire alarm Make sure that the probe connection cables are correctly switched 5 and 6 and 17 and 18 in their respect...

Page 15: ...place the transparent lid well Screw the transparent cover back on Fix the pressure switch in the position indicated by means of the self tapping screws provided on the side of the machine are the fixing holes Cut to size and connect the transparent tube from the socket to the inlet pressure switch and from the socket to the pressure switch input firmly on the pressure switch it must reach the sec...

Page 16: ... cause over currents that could damage the motor This same effect can occur if the requested static pressure is greater that the losses of load produced in the pipeline network To solve this act on the flow control gates by closing them in order to produce a greater load loss Connect the external switch and stop it a few moments later Check that the direction of rotation of the motors coincides wi...

Page 17: ...ll times the Regulation of Technical Facilities complementary to the buildings regarding the application of maintenance standards must apply except for technical justification It is of vital importance and depending on the operating need of the equipment to make a list of those essential elements for an early troubleshooting procedure Based on this list the necessary spare stock will be valued in ...

Page 18: ...as a spare Under no circumstances will the operation of the equipment without filters be allowed as this could affect soiling of vital elements of the equipment and therefore their deterioration and a loss of efficiency 8 3 1 REPLACEMENT OF MAIN DEVICE FILTER To extract the filter the corresponding inspection record must be opened and removed by sliding the filter outwards for prefilter and GRSyst...

Page 19: ...PURE AIR JUST BREATHE PAR_INSTALLATION MANUAL_200812 zonair3d zonair3d com zonair3d com ...

Reviews: