ASSEMBLY OF THE MAIN UNIT
2.Put the Kettle (C) onto hangers which
located in the Main Unit (A), slip hanger
bars into slots on hangers.
Make sure gears are properly meshed
together.
3.Plug the Kettle (C) into the outlet which
located on the ceiling of Main unit (A).
CAUTION:
Before plugging, make sure all switches
are in OFF position.
4.The assembly of Main unit finished.
MAKE SURE the Kettle is seated well and
all parts are well assembled.
1. Remove all packaging and take out the
parcel which was stored in the Main unit (A),
find Glass doors (B) and insert pins into
hinges.
meanwhile, put the four triangular caps (I)
onto the corner of top plate.
Note: Always place the equipment on a
sturdy & level base.