Zoeller Company does not recommend a simplex station on anything over two homes in order to maintain continuous service during unusual  

conditions.

Recommended Limits of Application X70 Series Grinder Pumps

These recommended application limits are for pump stations pumping to a gravity main.  Low-pressure pipe systems should be designed with a 

pump located at each house.  For applications where a lift station would handle between 15 and 60 homes, consider the 71 Series grinder pump.  

For applications where a lift station would handle more than 60 homes, a solids handling type pump should be considered.

Simplex Station

Duplex Station

Model

HP

Homes

GPD

Homes

GPD

X7011 w/o Reversing Control

2

2*

800

10

4,000

X7011 w/ Reversing Control

2

2*

800

15

6,000

X7012

2

2*

800

10

4,000

X7013

2

2*

800

10

4,000

than in raw sewage pumping applications.  The warranty set out in the 

paragraph above is in lieu of all other warranties expressed or implied; 

and we do not authorize any representative or other person to assume 

for us any other liability in connection with our products.

Contact Manufacturer at, 3649 Cane Run Road, Louisville, Kentucky  

40211, Attention: Customer Service Department to obtain any needed 

repair or replacement of part(s) or additional information pertaining to 

our warranty.

MANUFACTURER EXPRESSLY DISCLAIMS LIABILITY FOR 

SPECIAL, CONSEQUENTIAL OR INCIDENTAL DAMAGES OR 

BREACH OF EXPRESSED OR IMPLIED WARRANTY; AND ANY 

IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE 

AND OF MERCHANTABILITY SHALL BE LIMITED TO THE DURATION 

OF THE EXPRESSED WARRANTY.

Some states do not allow limitations on the duration of an implied warranty, 

so the above limitation may not apply to you. Some states do not allow 

the exclusion or limitation of incidental or consequential damages, so 

the above limitation or exclusion may not apply to you.

This warranty gives you specific legal rights and you may also have 

other rights which vary from state to state.

Limited Warranty

Manufacturer warrants, to the purchaser and subsequent owner during 

the warranty period, every new product to be free from defects in material 

and workmanship under normal use and service, when properly used 

and maintained, for a period of one year from date of purchase by the 

end user, or 18 months from date of original manufacture of the product, 

whichever comes first.  Parts that fail within the warranty period, one 

year from date of purchase by the end user, or 18 months from the 

date of original manufacture of the product, whichever comes first, that 

inspections determine to be defective in material or workmanship, will be 

repaired, replaced or remanufactured at Manufacturer's option, provided 

however, that by so doing we will not be obligated to replace an entire 

assembly, the entire mechanism or the complete unit.  No allowance 

will be made for shipping charges, damages, labor or other charges that 

may occur due to product failure, repair or replacement.

This warranty does not apply to and there shall be no warranty for any 

material or product that has been disassembled without prior approval 

of Manufacturer, subjected to misuse, misapplication, neglect, alteration, 

accident or act of God; that has not been installed, operated or maintained 

in accordance with Manufacturer's installation instructions; that has been 

exposed to outside substances including but not limited to the following:  

sand, gravel, cement, mud, tar, hydrocarbons, hydrocarbon derivatives 

(oil, gasoline, solvents, etc.), or other abrasive or corrosive substances, 

wash towels or feminine sanitary products, etc. in all applications other 

Model X7011, X7012 and X7013 Applications

1.  Zoeller Grinder Pumps are designed for grinding and pumping 

sanitary sewage from submersible lift stations.  The pump is intended 

to grind and pump reasonable quantities of items normally found in 

sanitary sewage applications.

2.  Zoeller Grinder Pumps can be installed in new applications or as 

a direct replacement for any grinder application of like size and 

capacity.  Some rail system retrofit kits are available.

3.  The can be installed in a Prepackaged Job Ready System or may 

be used in a Field Assembled basin package.  Page 6 shows a 

Prepackaged System. Field Assembled Systems are discussed 

on page 4.

4.  Zoeller  Grinder  Pumps  can  be  retrofitted  to  existing  positive 

displacement pump installations.

Summary of Contents for X70 Series

Page 1: ...Typical Indoor Prepackaged System 6 Indoor Prepackaged Installation Instructions 7 Typical Outdoor Prepackaged System 8 Outdoor Prepackaged Installation Instructions 9 Operation 10 Cutter Maintenance 11 Service Checklist 12 REFER TO WARRANTY ON PAGE 2 This manual incorporates the installation operation maintenance and service instructions into one document to aid in the ownership of a Zoeller subm...

Page 2: ...sequent owner during thewarrantyperiod everynewproducttobefreefromdefectsinmaterial and workmanship under normal use and service when properly used and maintained for a period of one year from date of purchase by the end user or 18 months from date of original manufacture of the product whichever comes first Parts that fail within the warranty period one year from date of purchase by the end user ...

Page 3: ...hree phase pumps must be connected for proper rotation which is counterclockwise looking into impeller inlet See page 4 for instructions for checking 3 phase rotation 6 Grinder installations should be checked frequently for debris and or buildup which may interfere with the ON OFF cycles or the positions of variable level float control switches For repair and service other than cutter assembly mai...

Page 4: ...All electrical connections including pump to control box and power supply to control panels must comply with the National Electrical Code and applicable local codes Conduit and panel enclosure openings must have a gas and watertight seal Installation of electrical panels conduit and connections should be made by a qualified licensed electrician AULListed potting kit P N 10 2350 is available from Z...

Page 5: ...al shock Do not remove the power supply cord and strain relief or connect conduit directly to pump Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician FIGURE 2 LEAD IDENTIFICATION WIRING DIAGRAM SINGLE PHASE 2 BHP MODEL X7011 SK1367 009048 THREE PHASE MODELS X7011 X7012 X7013 FIGURE 4 FIGURE 3 L1 START RELAY START CAPACITOR GREEN RE...

Page 6: ...tation FIGURE 5 SK2843 36 MINIMUM SHUT OFF VALVE 2 DISCHARGE PIPE 3 4 GUIDE RAILS CHECK VALVE WEEP HOLE NON SPARKING RAIL SYSTEM 1 1 4 X 2 ANTI FLOATATION RING WEIGHTED FLOAT SWITCHES LEAD PUMP OFF FLOAT LEAD PUMP ON FLOAT ALARM FLOAT LAG PUMP ON FLOAT INLET FITTING SHIPPED LOOSE TO CONTROL PANEL 28 MIN OR PER STATE AND LOCAL CODES HATCH COVER HATCH COVER STEEL ALUMINUM GAS TIGHT CONTROL PANEL INS...

Page 7: ... the side of the basin using the sealant and hardware provided 6 The bottom of the excavation can now be properly backfilled compacted and leveled Set basin in hole Ensure the removable cover extends above the finished grade line and the grade slopes away from the unit Backfill and subbase should be 1 8 3 4 pea gravel or 1 8 1 2 crushed stone Reference basin installation instructions included with...

Page 8: ...e codes and specifications regarding Class I Division 1 Group C D environments Basin must be sized to allow a minimum 3 minute off time between starts 7 The tethered variable level float switches must be free and not hang up on pump or pit peculiarities Float switch circuits shall be intrinsically safe 8 If a rail system is used it should be non sparking Discharge elbow must be firmly anchored to ...

Page 9: ...dry sealed and securely installed Floats positioned properly Discharge valves open 3 16 vent hole drilled in pipe between check valve and pump Once the above has been verified proceed with the following checks Pump power cables and control floats properly installed and voltage verified Conduit connections to panel are properly sealed After installing the pump into the containment area with adequat...

Page 10: ...emove the spacer shims located behind the star cutter 5 Remove the three cap screws holding the disc and remove disc from the pump 6 The disc and star cutter can be replaced with new service parts or resurfaced by grinding Resurfacing is accomplished by surface grindingbothdiscandstarcuttertoa32microfinish Donotattempt grinding in the field Send parts to a qualified machine shop or return to the f...

Page 11: ...de and all applicable local codes and ordinances LUBRICATION PROCEDURES No lubrication is required If pumps are to be stored for more than six months refer to short term storage procedure in the Operation section PREVENTIVE MAINTENANCE preventive maintenance is recommended to ensure a long service life from the product Provided is a suggested maintenance schedule Every month Check for proper and u...

Page 12: ...2018 Zoeller Co All rights reserved MAILTO P O BOX 16347 Louisville KY 40256 0347 SHIPTO 3649 Cane Run Road Louisville KY 40211 1961 502 778 2731 1 800 928 PUMP FAX 502 774 3624 visit our web site zoellerengprod com ...

Reviews: