5
© Copyright 2016 Zoeller
®
Co. All rights reserved.
BATTERY
RED LEAD
TO PO)
TO NEGATIVE(-)
BLACK LEAD
SWITCH
CUT AWAY OF SUMP PIT
RED LEAD
TO PO)
MOTOR
CHARGER
NEGATIVE(-)
BATTERY TERMINAL
BATTERY TERMINAL
PO)
OUTLET
ALARM
BLACK LEAD
TO NEGATIVE (-)
STEP 4
Electrical Connections for Model 585
4.1) Complete electrical connections as shown in Figure 4.1.
CAUTION
Do not place battery or charger directly on ground. If
the battery or charger must be placed directly on the ground, then
place a piece of wood between the units and the ground. Do not
put the charger on top of the battery.
Figure 4.1
STEP 5
Testing of Pump Operation
6.1) Unplug the primary pump so that it does not start.
6.2) Fill pit with water until the
Aquanot
®
starts.
6.3) Verify that the pump starts and stops at the desired on/off points.
6.4) Verify that there are no leaks in the discharge line.
6.5) If adjustment is necessary, raise or lower the appropriate stop(s) according to STEP 2.
IMPORTANT:
Spacing between upper and lower stops determine amount of water removed from pit.
6.6) If the pump is not operating properly after following the above steps, refer to the Troubleshooting guide on page 8.
6.7) When finished testing plug primary pump back into AC receptacle.
STEP 3
Installation of the Discharge Piping
3.1) Assemble the discharge pipe into the pump as shown in Figure 3.1.
IMPORTANT:
In order for this installation to work properly, a check valve must be installed onto the discharge line.
P/N 30-0100
P/N 30-0101
P/N 30-0102
P/N 30-0103
Figure 3.1
SK1783
SK1778
Recommend the following Zoeller check valves:
Some local codes require union check with ball valve.
}