background image

Page 7 

English

  

 

Jandy

®

 Pro Series, Slide Valve & Backwash Valve   

|

   Installation & Operation Manual

Figure 7.  handle Positions (sVlV2 shown) 

Caution - handle Positions for Backwash 

Only

Figure 8.  loosen lid Union nut

(Other Manufacturers Filters with the filter 

top port as the inlet)

 Ensure that the Slide Valve 

handle is fully depressed (handle and piston 

pushed all the way down). Turn the handle until 

the stainless steel pin on the piston locks into the 

position bracket. 

4. 

Turn on the system pump(s) and run the system 

until the waste water runs clean.

iMPORTAnT nOTE

  Be sure to follow any and all applicable 

local codes related to proper discharge/drainage of 

water from your pool/spa.

5. 

Turn off the system pump(s).

6. 

Return the Slide Valve handle to the normal 

operating position. See Section 3. 

7. 

Turn on system pump(s) and check for normal 

water flow. 

section 6.  servicing

 WARning

nEVER

 attempt to assemble, 

disassemble or adjust the filter when 

there is pressurized air in the system. 

Starting the pump while there is 

any pressurized air in the system 

can cause the filter lid to be blown 

off, which can cause death, serious 

personal injury or property damage.

1. 

Turn off the system pump(s).

2. 

Open the air release valve on top of the filter tank 

to release all pressure from inside the tank and 

system. Wait for all the air to evacuate the system.

3. 

Loosen the lid union nut. See Figure 8.

4. 

Grab the Slide Valve handle and pull the shaft 

assembly out of the valve. See Figure 9. 

5. 

Inspect the shaft and the o-rings for wear, cuts, 

cracks, and debris. If the o-rings show any sign 

of wear or damage, replace with Jandy o-ring and 

Roll Pin Replacement Kit (P/N R0442100).

nOTE

  The o-ring inspection includes the lid o-ring. Please 

be aware that the roll pins are different lengths; the 

handle roll pin is 1" long and the shaft roll pin is 13/16" 

long.

6. 

Wash the shaft and o-rings with clean water and 

dry with a lint-free cloth. 

Ensure that all debris is 

removed.

dE Filter

handle 

Fully 

Extended 

(pulled up)

sand Filter

handle Fully 

depressed 

(pushed down)

lid Union nut

Summary of Contents for Jandy Pro Series

Page 1: ...oduct read and follow all warning notices and instructions that accompany this product Failure to follow warning notices and instructions may result in property damage personal injury or death Imprope...

Page 2: ...le of Contents Section 1 Safety Information 3 Section 2 SVLV8 Installation 4 Section 3 SVLV2 and Versa Coupler Installation 5 Section 4 Normal Operation 6 Section 5 Backwash Mode 6 Section 6 Servicing...

Page 3: ...sult in death serious personal injury or property damage Be sure all air is out of system before operating or testing the equipment WARNING To minimize risk of severe injury or death the filter and or...

Page 4: ...ration mode fully extend the valve handle See Figure 1 Section 2 SVLV8 Installation 1 Remove the Slide Valve from the packaging Twist the handle on the Slide Valve several times to verify that the pis...

Page 5: ...tain filters may require only one 1 versa coupler p n 8044 1 Slide one 1 versa coupler into PORT C and one 1 into PORT D on the Slide Valve 2 Hold the Slide Valve up to the filter and twist the versa...

Page 6: ...2 Open the air release valve on top of the filter tank to release all pressure from inside the tank and system Wait for all the air to evacuate the system 3 Jandy Pro Series DEL DEV and JS series Filt...

Page 7: ...e filter when there is pressurized air in the system Starting the pump while there is any pressurized air in the system can cause the filter lid to be blown off which can cause death serious personal...

Page 8: ...at there is no water left in the valve place the shaft back into the Slide Valve and tighten the lid union nut 7 Position the Slide Valve in Backwash mode See Section 4 Jandy DEL DEV and JS series Fil...

Page 9: ...ash Valve Installation Operation Manual Figure 10 Slide Valve Head Loss Curve Slide Valve with DE Filter Data Shown 0 0 2 3 4 6 6 9 9 2 11 5 0 50 100 25 75 125 Flow Rate GPM Design Head Loss Feet Head...

Page 10: ...andle 1 1 Roll Pin Shaft 13 16 1 Index Plate Lid 1 2 Rebuild Kit O rings Roll Pins and Index Plate Lid BWVL SLD R0473000 O ring Lid 1 O ring Shaft Top Black 1 O ring Shaft Bottom Purple 1 O ring Union...

Page 11: ...Page 11 ENGLISH Jandy Pro Series Slide Valve Backwash Valve Installation Operation Manual 1 2 3 4 3 4 3 4 1 2 3 1 2 3 4 1 2 3 1 2 3 4 3 1 2...

Page 12: ...1 800 822 7933 www ZodiacPoolSystems com ZODIAC is a registered trademark of Zodiac International S A S U used under license All trademarks referenced herein are the property of their respective owner...

Reviews: