![Zodiac Chlor Perfect Instructions For Installation And Use Manual Download Page 10](http://html1.mh-extra.com/html/zodiac/chlor-perfect/chlor-perfect_instructions-for-installation-and-use-manual_4010799010.webp)
8
2.2 I Hydraulic connec� ons
2.2.1 Sensor and injecti on point locati on
•
The ORP sensor must be installed more than 30 cm before or a� er a piping bend. Use the op-
ti onal POD kit if necessary. Failing to follow this positi oning can lead to incorrect or unstable
measurements.
•
The ti p of the ORP sensor must not be in contact with the pipe.
•
Never install a ORP sensor before the fi ltering pump or between the pump and the fi lter. This
would cause random readings and a shortened service life.
•
The ORP sensor must be placed a� er the fi lter and before the heati ng system,
•
It must be placed verti cally or sloping at a maximum of 45°; it should never point downwards.
•
The liquid chlorine injecti on point must be positi oned before a pH corrector injecti on point and a� er the
heati ng system.
Summary of Contents for Chlor Perfect
Page 2: ......